208 projects found.  
Project NameProject NumberProject TypeCouncil DistrictScope of Work
NW Hampton Road Bridge over Brush Creek
Details | Show on Map
89005500Bridges2Replace the existing bridge with a concrete arch structure
and also recontruct the approach roadway.
Design-Build Contract for Phase III of the
Liberty Memorial World War I Museum.
Details | Show on Map
70050003Buildings4The overall scope of the project is to construct additional
museum space to include two (2) functioning levels with
a freight elevator.  The Exhibit Level is on the main
entrance level of the museum and will include a West Lobby,
a Glass Portrait Wall, and a clear view below of a replica
DEMO 83rd Street Bridge
Details | Show on Map
890A5474Bridges5Demolition of 83rd Street Bridge over Kansas City Souther
Railroad tracks. 
Barry Road over Rush Creek, Sec 2
Details | Show on Map
89005408Bridges2This bridge construction project is in conjunction with
the widening of NW Barry Road, section 2, (#8078), and includes
the construction of an arch culvert with two-12'
travel lanes, 4' bike lanes and a sidewalk on the outer
edge of each section.
New Metro Police Station
Details | Show on Map
89000931Buildings5This facility is classified as a new facility. The
location of the station will be in the approximate area
of 77th Street and Prospect Ave. in the East Meyer 7 and
Marlborough East neighborhoods. The new Metro Patrol Station
will replace an existing station to cover the population
Vivion Trail Phase 3
Details | Show on Map
64004003Trails / Paths1This project consists of only design and right of way acquisition for
bicycle/pedestrian trail from N Highland to the park 'n
ride station at the Antioch Shopping Center.  Project
also includes design of a sidewalk along 48th Street from
Highland Ave. to Antioch Road.  Project is coordinating with
Aquila Streetlights Phase 1
Details | Show on Map
89007533Streets2,5AQUILA Streetlight Improvements-Phase IThis project involves
the upgrade of the existing lights and the addition of new
lights to increase the level of light on the streets and
sidewalks to meet national Illuminating Engineering Society
standards. The Design/Build Contractor will be responsible
Santa Fe Trail - Wornall Road to Pennsylvania
Street
Details | Show on Map
89008129Streets6The scope of the project is design and construction
of a sidewalk and curb work, along Old Santa Fe Road
between Wornall and Pennsylvania.  A 10' wide pedestrian
trail will be added on the south side of the road, with
an addition to the vehicle bridge for pedestrian use. 
PW 3605 Sanitary Sewer extension in the vicinity
of 48th Terrace and Logan Avenue
Details | Show on Map
81000248Sanitary Sewers5PW 3605 Sanitary Sewer extension in the vicinity of 48th
Terrace and Logan Avenue, Project #3605, Sewer District
#13050, in Kansas City, Jackson County, Missouri. The project
will serve 7 property owners, 8 parcels of land, and consist
of approximately 735 linear feet of 8 pipe.
PW 3668 Sanitary Sewer extension in the
vicinity of 59th Street and Norfleet Road.
Details | Show on Map
81000253Sanitary Sewers5PW 3668 Sanitary Sewer extension in the vicinity of 59th
Street and Norfleet Road, Project #3668, Sewer Districts
#13045-13046, in Kansas City, Jackson County, Missouri.
The project will serve 21 property owners, 24 parcels of
land, and consist of approximately 1995 linear feet of 8
83rd St. Bridge over KCSRW
Details | Show on Map
89005474Bridges5Replace the existing closed bridge with a single-span steel
bridge over the Kansas City Southern Railroad tracks.
22nd Street/Baltimore to Cesar Chavez
Details | Show on Map
89008084Streets4Improvements along 22nd Street from Baltimore to Cesar Chavez.
Improvements will include 25' 4' wide asphalt street with
standup curb, paver sidewalk and crosswalks, pedestrian
and street lighting, drainage, landscaping, pavement marking,
signs. Scope modified to include work on 21st &
(5478-DW) NW 100th St. over Branch of Second
Creek
Details | Show on Map
89005478Bridges2Replacement of the existing collapsed drainage structure
with a new bridge structure and approach roadway over Second
Creek.
NE 55th St. & N Bennington Ave.
Details | Show on Map
89003768Sanitary Sewers1Design and construct sanitary sewer extension to remove
residential properties off private septic systems.
NE 61st St. & N Wheeling SD 20014-18
Details | Show on Map
89003406Sanitary Sewers16100 feet of sanitary sewer extension for 67 parcels of
land (63 property owners. The properties are currently on
private septic systems.  SD 20014-18
Emergency Sanitary Sewer Relocation @ 602
W. 88th Terrace, Council District #4The Installation
Details | Show on Map
81000343Sanitary SewersNAEmergency Sanitary Sewer Relocation @ 602 W. 88th Terrace,
Council District #4The Installation of 330 LF of new 8-inch
SDR 26 PVC sewer line in the area of 602 W. 88th Terr. in
Kansas City, MO.
Ruskin Heights Sewer Rehab - Rehabilitation
of sewer lines including all manholes in
Details | Show on Map
81000181Sanitary Sewers6The Rehabilitation/Replacement of approximately 37,240 linear
feet of 8-inch Vitrified Clay Pipe (VCP), 800 linear feet
of 10-inch Vitrified Clay Pipe (VCP), 4608 linear feet of
12-inch Vitrified Clay Pipe (VCP), 996 linear feet of 15-inch
Vitrified Clay Pipe (VCP) and the rehabilitation of all
Red Bridge Rd. Bridge over the Blue River
Details | Show on Map
89005464Bridges6Replace the existing bridge with a 1200 foot long prestress
girder bridge wtih shoulders. The new bridge will be built
on the offset alignment.
Cypress Pl. 59th to 60th St.
Details | Show on Map
89006740Streets5Widen and curb 600LF of Cypress Place from 60th Street north
to a cul-de-sac. Building a 28' wide street and one sidewalk
into 40' of ROW and making driveway grades work, makes for
a difficult project. Demo one house to build the cul-de-sac.
FIRE STATION 23
Details | Show on Map
89000023Buildings1,3This project was classified as a complete remodel of an
existing facility, designed to the Space Allocation
Standards.  The mechanical HVAC, plumbing, and electrical
power were completely overhauled. The windows were replaced
and the roof repaired. The two garage roll up doors and
PW 3530 Sanitary Sewer extension in the
vicinity of NE 48th and N Bristol Avenue
Details | Show on Map
81000255Sanitary Sewers1PW 3530 Sanitary Sewer extension in the vicinity of NE 48th
and N Bristol Avenue, Project #3530, Sewer District #2100,
in Kansas City, Clay County, Missouri. The project will
serve 8 property owners, 8 parcels of land, and consist
of approximately 1130 linear feet of 8 pipe.
Red Bridge Road Alternative Study
Details | Show on Map
890A8054Streets6The engineering study will examine the 2.8 mile section
ofRed Bridge Road from Holmes Road to Grandview Road and
provide design alternatives to the existing engineering
study completed in August 2004.  This portion of Red
Bridge Road includes three signalized intersections, an
12th Streetscape from Wyandotte to Locust
Details | Show on Map
64006107Streets2Design and build streetscape improvements for seven
block stretch of 12th Street from Wyandotte to Locust, modeling
the design from reccommendations in the Downtown
Streetscape Masterplan.
Hwy 40 & Marsh Ave. (connection/extension)
Details | Show on Map
81000309Sanitary Sewers3Construct an outfall sanitary sewer to tie a collection
sanitary sewer into the City sewer main.
FIRE STATION 36
Details | Show on Map
89000036Buildings6An all new fire station facility located at the corner
of 99th & Holmes Rd which will replace the existing
station at the corner of 95th & Holmes Rd. This is a
battalion chief headquarters that is a three bay, two-story
station.
Blue Ridge Blvd & 107th Street Geometric
and Signal Improvement
Details | Show on Map
89004421Traffic Signals6Upgrade existing controller and installation of new signal
equipment, and intersection geometrics to provide left turn
lanes on Blue Ridge Blvd.
Gracemor Storm Drainage Improvements
Details | Show on Map
82000075Storm Sewers1Gracemore Storm Drainage Improvements - Phase 19PIAC Project
to acquire right-of-way/construct storm drainage between
NE 55th & NE 56th St. East of N.Potter
Auditorium Parking Garage
Details | Show on Map
89000291Buildings2Repairs and improvements to Auditorium Aliis Plaza Garage
including structural repairs to parking decks and tunnels;
improvements to drainage system, fountain waterproofing,
pedestrian walkway and tunnel finishes and lighting, signage,
striping, and paint  
17th St. Improvements Topping to Bennington
Avenue
Details | Show on Map
89060005Streets3East 17th Street from Topping (5800) to Bennington Avenues
Improving south side by providing curb, driveways, sidewalk,
widen pavement & appurt.
2922 Myrtle Alley Repaving
Details | Show on Map
89020017Streets3Construct 425 feet of alley between 29th St. and 30th St.
West of Myrtle.
(7009 - CT) Cherry St Inn East Village Block
65
Details | Show on Map
64007009Buildings2Complete the design, oversight, remediation and demolition
of the Cherry Street Inn located at 921 Cherry Street.
City Hall 1st Floor Renovation
Details | Show on Map
890C0175Buildings2 Renovate the tenant space of 1st Floor - City Hall
west side.  Work includes installation of fire protection,
replacement of exisitng VAV boxes, new lighting, all new
interior finishes, new plumbing and ADA accessible restrooms. 
Alternate #1 consist of improvements on the 4th floor east
81st street and Brooklyn Avenue
Details | Show on Map
89003836Storm Sewers5Storm drainage improvements near 2215 E. 81st Street consist
of the construction of new curbs, storm sewer, inlets and
grading improvements. Part of 15SW PIAC Bundle.
Swope Ridge Geriatric Exterior
Details | Show on Map
890A0141Buildings5Parking lot repair, resurfacing; curb and sidewalk replacement;
redesign drive at north tower; new fences and gates; parking
lot lighting; security and alarm system; selective window
and door repairs and replacements; building signage; and
redesign of abandoned east entry facade, patios/courtyard. Added
19th Street - Woodland to Paseo
Details | Show on Map
89008092Streets3New stormwater and streetscape improvements in the 18th
& Vine District.
58th and Norfleet Drainage
Details | Show on Map
89003806Storm Sewers5Design and construct the box culvert on Norfleet to widen
Norfleet to three lanes and remove the roadway hazard.
56th Ter. and Booth Ave.
Details | Show on Map
89003835Storm Sewers5Construct approximately 1200' of pipe to enclose storm sewer
system from rear yard of 5624 Booth to Rinker Road. Part
of 15SW PIAC bundle.
COLE GROVE SEWER REHAB - Rehab of approx
247 linear ft of 33 1 114 linear ft of
Details | Show on Map
81000161Sanitary Sewers5Rehabilitation of approximately 440 linear feet of 33-inch,
900 linear feet of 36-inch, 165 linear feet of 42-inch,
1,230 linear feet of 48-inch, and 815 linear feet of 54-inch
segmented clay tile sewer, 20 manholes and the installation
of 4 junction boxe
BARTLE HALL
Details | Show on Map
89000284Buildings2  Bartle Hall Ballroom ExpansionFACT SHEET                        
LOCATION:   301 West 13th Street
NW 70th St and NW Overland Drive Sewer Main
Extension
Details | Show on Map
89003791Sanitary Sewers2Design of collection sanitary sewers, joint district sanitary
sewers and required appurtenances in developed areas without
public sewer access, currently on septic systems. 
This project is bundled with Project # 3618, another sanitary
sewer project of similar scope.
NW Interurban Rd. Bridge over Wildcat Branch
Details | Show on Map
89005445Bridges2The existing bridge will be replaced with a new bridge
that will have two 12 ft traffic lanes and a 5 ft sidewalk
on one side supported by single-span steel girders. A staged
construction method will be used to keep this bridge open
during construction.
18th & Vine Retail Improvement - 1513 N.
18th Street
Details | Show on Map
64006342Buildings3This project consists of a study of the existing condition
of 1511 E. 18th Street , a 2,750 square foot retail property
on the National Register of Historic Spaces. The scope of
work includes evaluation of the building in all aspects
including structure, building envelope, mechanical, electrical,
Vehicle Impound Facility
Details | Show on Map
89000502Buildings1 This new facility, designed to provide services for
a new Tow Lot Facility to support the Neighborhood &
Community Services Department, Tow Lot Services Department,
will replace the existing operations at 6817 Stadium Drive
in Kansas City.  The program for this replacement facility calls
PW 3611 Sanitary Sewer extension in the vicinity
of 48th Street and Logan Avenue. The project
Details | Show on Map
81000252Sanitary Sewers5PW 3611 Sanitary Sewer extension in the vicinity of 48th
Street and Logan Avenue, Project #3611, Sewer District #13051,
in Kansas City, Jackson County, Missouri. The project will
serve 5 property owners, 7 parcels of land, and consist
of approximately 598 linear feet of 8 pipe.
22nd-23rd Corridor Sec 1B - Tracy to Brooklyn
Details | Show on Map
89008008Streets3Geometric and roadway improvements along 22nd Street corridor
from Tracy to Brooklyn, consisting of drainage, grading,
paving, curbing, retaining walls, street lighting, traffic
signals and interconnection, pavement marking, signing,
landscaping, and other amenities.
Union Hill S/Scape - Electrical
Details | Show on Map
64007018Streetscape4The project includes street lighting with associated wiring
and equipment and some pole removals in the Founders at
Union Hill Development, generally bounded between or along29th
Street, 30th Street, McGee Street, Oak Street and Gillham
Road.
N Bennington- Parvin Rd to NE 48th Street
Details | Show on Map
89008157Streets1Collector street improvements
New Police Academy
Details | Show on Map
89000930Buildings1This facility will house a 500 seat auditorium, administrative
offices for in-service training and recruiting, running
track, gym, weight room, fitness room, lockers, and showers.
It will also have various types and sizes of classrooms.
Located at 6885 NE Pleasant Valley Road. The new Regional
Fire Station 23 Fueling Station
Details | Show on Map
890A0023Buildings1,3Fire Station 23 Fueling Station to be located to the west
of the fire station. It is a fueling station and parking
area for addional fire companies that will attending training
sessions at the station and or fuel their vehicles.
Union Hill S/Scape - Wrought Iron
Details | Show on Map
64007020Streetscape4The project includes the complete installation of Commercial
and Residential Wrought Iron Fencing in the Founders at
Union Hill Development.  The Fencing is generally located
between or along 29th Street, 30th Street, McGee Street,
Oak Street and Gillham Road
135th & Cherry Sewer Connect. Construct
880' of sewer with appurtenances including
Details | Show on Map
81000384Sanitary Sewers6135th & Cherry Sewer Connect. Construct 880' of sewer
with appurtenances including PIAC 25% match
Santa Fe Trail Oak to Wornall
Details | Show on Map
89020062Trails / Paths61,200 linear foot pedestiran asphalt trail; 10' wide with
traffic controll bollards and Old Santa Fe historic signage.
Music Hall Renovation
Details | Show on Map
89A00281Buildings2This project is considered a building rehabilitation and
addition.  Work on the Music Hall will consist of the
following 10 improvements:(1)  Stage expansion by adding
15 feet of depth.(2)  An upgraded steel penthouse
tower will be raised and expanded on the roof to accommodate
(E7009-CT) East Village Block 81 *Parking
Garage*
Details | Show on Map
640E7009Buildings2Construction of the East Village Block 81 Parking Garage
(Design-Build)
88th & N Forest Ave.
Details | Show on Map
89003409Sanitary Sewers2This area will remove septic tanks for nineteen
homes with the construction of 2,350 feet of sanitary
sewer. Water Services paying additional $80,526 toward construction
that is not in the total.
12th St. Viaduct - Phase 2 (East Approach)
Sub Repair
Details | Show on Map
89005534Bridges2Sub-structure repairs on the west approach 
NE 32nd St. & N Garfield Ave.
Details | Show on Map
89003767Sanitary Sewers1Design and construct sanitary sewer extension to remove
residential properties off private septic systems
Marlborough Storm Drainage - 80th to 82nd
St. and Montgall to Benton
Details | Show on Map
89003394Storm Sewers5This project includes enclosed storm sewer pipe, field inlets
and a detention pond. This project will be built in
2 phases.
Union Hill S/Scape - Landscaping
Details | Show on Map
64007015Streetscape4The project includes landscaping, pavers and modular block
wall in the Founders at Union Hill Development generally
located between or along 29th Street, 30th Street, McGee
Street, Oak Street and Gillham Road. 
NW Barry Road- section 1B2 N Conant to N
Congress
Details | Show on Map
89008124Streets2This project includes the widening of NW Barry Road to a
four lane divided median section with curbs and gutters,
an enclosed storm sewer, street lighting, bike lanes and
sidewalks.
PW3727 Sanitary Sewer extension in the
vicinity of 135th Street and Cherry Street
Details | Show on Map
81000250Sanitary Sewers6PW3727 Sanitary Sewer extension in the vicinity of 135th
Street and Cherry Street, Project #3727, Sewer District
#6028, in Kansas City, Jackson County, Missouri. The project
will serve 11 property owners and consist of approximately
880 linear feet of 8 pipe.
58th St. Bridge over KCSRW
Details | Show on Map
89005443Bridges5Replacement of the existing wood trestle bridge with a new
bridge that will have two, 12' lanes to span the Kansas
City Southern Railroad tracks.
Red Bridge Rd. Sec. 2 - Holmes Rd to Blue
River Rd.
Details | Show on Map
89008054Streets6Improvements include widening Red Bridge Road from Holmes
Road to Blue River Road to a 4-5 lane facility with bike
lanes on both sides and sidewalk on the north side.
Municipal Aud. Ext. Renovation
Details | Show on Map
89B00281Buildings2This project involves cleaning and restoration of the masonry
and architectural elements on exterior of the building. 
N Brighton Avenue East Bridge over Mill Creek
Details | Show on Map
89005459Bridges1The widening of North Brighton Ave from Vivion Road to NE
58th Street (Project # 2675) will require the replacement
of the bridge over Mill Creek. This project will include
the Northbound bridge to be replaced over Mill Creek. 
The Southbound bridge replacement will be completed with
3813 - 97th & Holmes Sanitary Sewer
Details | Show on Map
89003813Sanitary Sewers6Design and construction of sanitary sewers to serve approximately
10 properties currently on septic systems.
18th & Vine Gateway Terrace
Details | Show on Map
890C0233Streetscape3This project provides preliminary design services to determine
the basis of construction documents for landmark signs at
the east and west entrance to the 18th & Vine Jazz District.
The design will also include an outdoor terrace in the District.
620 W 85th Terr. & Summit Sec 3 - W 88th
St. to 89th St. along Ward. Pkwy.
Details | Show on Map
89003789Storm Sewers4Approximately 1,100' of 7' x 5' enclosed trunk line storm
sewer, 850' of branch storm sewer ranging in size from 15''
to 36'' in diameter, including 14 new curb inlets, 6 replacement
curb inlets, 7 sewer junction structures, 150 feet of replacement
curb, and 4,200 sq. yards of replacement sodding from 88th
87th St - Section 2 - 1.2 Miles E of BRW
Details | Show on Map
89008113Streets6Roadway improvements consist of the realigning, widening,
paving, replacing curbs and gutters, sidewalks, storm and
sanitary sewers, water main relocation, and other appurtenances
along with the addition of roundabouts at both I-435
intersections, Hilcrest Road and Newton Avenue for this
Suburban Junction Bridge Rehabilitation
Details | Show on Map
89005473Bridges1Replace the bridge deck and repair the substructures.
Zoo Tropics Building
Details | Show on Map
70050004APublic Spaces5The scope of work for the 1909/Tropics building includes
the complete renovation of one of the oldest buildings at
the Zoo that was built in 1909. 
Truman Road Streetscape/Bridge
Details | Show on Map
89005550Streetscape2Streetscape and pedestrian improvements from Baltimore to
McGee along Truman Blvd and Bridge Repairs for Baltimore,
Main, Walnut and McGee all over I-670
Beardsley Rd. Bridge St Louis Ave. - 17th
St.
Details | Show on Map
89005409Bridges2Replacement of 640 LF of Beardsley Road Bridge, restoration
and reconstruction of retaining wall structure and replacement
of 1160 LF of roadway, which is located between 12th Street
and 17th Street.
66th and Manchester
Details | Show on Map
89003451Sanitary Sewers5Design and construct sanitray sewer extension for 89 parcels
of land, with aproximately 240 residents. The properties
are served by private septic systems. This project will
allow the owners to tie into public sewers. Water Services
paying an additional $644,162 for construction not inlcuded
97th St. & Eastern Ave. SD 786 861 & 13023
(Bannister Acres)
Details | Show on Map
89003723Sanitary Sewers6This project will construct a collection system to remove
residences from septic systems and and hook to City sewer.
KC MUSEUM MAIN BUILDING
Details | Show on Map
89000190Buildings1In the Main Museum building and Carriage House, Masonry
cleaning, roof and window repair and replacement.Project
includes removal of existing windows and doors and framing.
New Historical-profile windows & doors will be installed
on the main floor, basement and the upper two floors. The
Reactivate-NE 50th Street and NE Barnes Ave.
Details | Show on Map
89003818Storm Sewers1Construct enclosed storm sewer along I-35 ROW, inlets, upgrade
two cross-road culverts, and other necessay appurtenances.
Part of 15SW PIAC bundle.
FIRE ACADEMY TRAINING TOWER
Details | Show on Map
89000059Buildings1This was a renovation project to improve the existing six
story Fire Training Tower at the Fire Academy at 5130 Deramus
Street. Improvements included the replacement of doors,
shutters, floor drains, stair handrails, and electrical
service. A natural gas line was be brought to the building
East Village 1% for Art
Details | Show on Map
640F7009Public Art2East Village 1% for Art
Little Village Drainage Improvements -- Sec
3
Details | Show on Map
89003821Storm Sewers1Stormwater improvement providing larger sewer lines, new
curb and gutter, and new catch basins in the Little
Village subdivision.
4814 N White
Details | Show on Map
82000094Storm Sewers1Storm Drainage Improvement at 4814 N White - Construct enclosed
system from front of 4814 N White; southwest to existing
curb inlet near 48th & Bellaire.
Raytown Rd. Bridge over Round Grove Cr (E)
Details | Show on Map
89005447Bridges5The new bridge will have a total of three spans and will
be constructed on the existing alignment.
PW 3730 Sanitary Sewer extension in the vicinity
of NE 52nd Street and Randolph Road
Details | Show on Map
81000254Sanitary Sewers1PW 3730 Sanitary Sewer extension in the vicinity of NE 52nd
Street and Randolph Road, Project #3730, Sewer District
#20019. in Kansas City, Clay County, Missouri. The project
will serve 14 property owners, 15 parcels of land, and consist
of approximately 645 linear feet of 8 pipe.
NE 88th & N Lathrop Ave
Details | Show on Map
89003400Sanitary Sewers2This neighborhood will be upgraded by removing septic tanks
for fourteen homes though the construction of 2,192
lineal feet of sanitary sewers.
75th St. and Westridge Storm Drainage
Details | Show on Map
89003479Storm Sewers5Construct approximately 700' of storm sewer ranging in
size from 18'' to 60'' in diameter, including 200' of 72''
Permalok Steel Pipe trenchless construction, a concrete
headwall, 7 field inlets, 90 sq. yds. of pavement restoration,
500 sq. yards of rip-rap.
12th St. Viaduct over Railroad (Phase 3)
Details | Show on Map
89005442Bridges2Repair the bridge superstructure including bridge deck,
expansion devices, and railings.
49th & Farley Ave. Sanitary Sewer
Details | Show on Map
89003778Sanitary Sewers5This project will construct new gravity sewer infrastructure
including 8" pipe to serve 41 parcels and 35 houses. This
project will remove residences from septic systems.
American Royal Drive Ramp Rehabilitation
Details | Show on Map
89005495Bridges2  Replace the bridge and Column No.2.
Kansas City Zoo - Promenade
Details | Show on Map
70050004BPublic Spaces5 The Zoo Promenade will be a new 28' wide walkway that
will connect the front door of the Zoo to the bridge into
the African exhibit.  The Promenade will greatly reduce
the amount of time and distance it takes to walk to the
African exhibit.
Butler Way Connection
Details | Show on Map
89001001Bridges2Geometric improvements.
59th & Norfleet Rd. SD 13045 &13046
Details | Show on Map
89003668Sanitary Sewers5Construction of 1,995 of 8" sanitary sewer to serve fourteen
proerties in two sewer benefit districts to remove them
from septic tanks.
Bannister Rd & Blue Ridge Blvd Geometric
and Signal Improvement
Details | Show on Map
89004283Traffic Signals6Geometric improvements and traffic signal modifications
at Bannister Road and Blue Ridge Blvd. Consisting of adding
left turn lanes and installation of mast arms, cameras,
pull boxes, traffic controller, conduits, and other necessary
appertunances.
75th and Cleveland
Details | Show on Map
89003831Storm Sewers5Construction of new curbs along both sides of 75th Terrace
for a distance of approximately 100 feet, approximately
30 l.f. of storm sewer, approximately 3 inlets, and pavement
improvements. Part of 15SW PIAC bundle.
5315 N. Washington Street
Details | Show on Map
89003823Storm Sewers2Construct an enclosed system from end of flum behind 5311
N Washington Street North and West to field inlet behind
5401 N Washington Court
52nd Street and Wornall Rd. Storm Sewer
Details | Show on Map
89003826Storm Sewers4The proposed construction consists of the removal and replacement
of existing grate inlets and curb inlets along with new
storm sewer lines on both sides of Wornall road adjacent
to Loose Park south of 52nd street.
12th St. Viaduct - Phase 1 (West Approach)
Sub Repair
Details | Show on Map
89005528Bridges2Rehabilitation of the sub-structure on the west approach.
34th and Genessee
Details | Show on Map
89003828Storm Sewers4The proposed construction consists of the replacement of
approxmatley 100 feet of curb and gutter on the north side
of 34th street, and the east side of Genessee Street, and
the construction of a concrete flume immediately north of
the intersection of these two streets.
257 Bridlespur
Details | Show on Map
89003807Storm Sewers6In two construction phases, reconstruct approximately 1,430'
of lined open channel storm sewer with rock basket walls,
grade control, and stone sideslopes to replace the deteriorating
concrete channel.
7908 NW Milrey Dr./Stoddard Storm Sewer Sec
1 - NW Belvedere to NW 80th
Details | Show on Map
89003543Storm Sewers2Phase 1A: Construct approximately 1,950 feet of open channel
improvements consisting of gabion baskets, coir logs, sack
gabions and turf reinforcement matrix (TRM), replacement
and modification of existing storm drainage pipe outlets,
grading, plantings and seeding of native plant species,
Davidson Phase 2 - NE 52nd Terr to NE 53rd
Details | Show on Map
89003786Storm Sewers1Improve a natural channel, providing channel stabilization
and hardening, from 5203 N Virginia to 5307 N Virginia.
3707 E. 107th Terr Street Improvements
Details | Show on Map
89008110Streets6Water floods over curb at this address. Install 900 feet
of pipe and inlets and regrade about 400 feet of street  
Replace lazy back curb with CG-1 on west 2/3 of block.
NW 128th St. Bridge over Wildcat Branch
Details | Show on Map
89005462Bridges2Replacement of the existing structurally deficient bridge
over Wildcat Branch with a new bridge structure and new
approach roadways including 865 feet of roadway
improvement.
Red Bridge Road, Phase 1
Details | Show on Map
890B8054Bridges6Red Bridge Road, Phase 1
Forrester Viaduct over Railroad
Details | Show on Map
89005438Bridges2Replacement of a 15 Span Rolled Steel Wide Flange Bridge.
This bridge extends over the Union Pacific Railroad, Santa
Fe, and Mulberry Streets. There will be access provided
on 9th Street, St. Louis Ave., Union Ave., Beardley Road,
and Union Ave. This b
72nd St. from College to Bales
Details | Show on Map
89003634Storm Sewers5Construct approximately 2,000' of storm sewer ranging in
size from 15'' to 48'' in diameter, 30 curb inlets, 1,500'
of curbing, pavement repair, replacement sidewalk and driveways,
two water main relocations, and sodding from 73rd &
Bales to 73rd & Indiana to 72nd & Indiana , and
80th St. & Summit (Waldo Creek) Storm Drainage
Sec 3 - 80th & Summit to 79th & Jefferson
Details | Show on Map
89003596Storm Sewers4Construct approximately 2,800' of storm drainage improvement
from Ward Parkway Blvd to Mercier Street, 80th & Summit
to 79th & Jefferson, and west & east laterals along
79th Street from Jefferson. Water services paying $231,958
for water main relocation not inlcuded in total.
Duke Gibson Dr. Storm Drainage
Details | Show on Map
89003521Storm Sewers6Construct about 650 LF of stormwater channel with other
necessary appurtenances.
North Congress Street Improvements Design
- 73rd to Hwy. 9
Details | Show on Map
89008091Streets2This portion of N Congress serves as a collector road and
is a Phase III bike route. Row varies from 32 to 60'. The
bridge has been surveyed as needing maintenance. The creek
is a Zone A regulated floodplain that drains down to Parkville. 
Raytown Rd. Bridge over Round Grove Cr (W)
Details | Show on Map
89005448Bridges5Replacement of the existing bridge wtih a three span prestress
girder bridge with shoulders. The new bridge will be built
on the existing alignment.
PW 3613 Sanitary Sewer extension in the vicinity
of 48th Street and Emery Avenue
Details | Show on Map
81000249Sanitary Sewers5PW 3613 Sanitary Sewer extension in the vicinity of 48th
Street and Emery Avenue, Project #3613, Sewer District #13052,
in Kansas City, Jackson County, Missouri. The project will
serve 10 property owners, 11 parcels of land, and consist
of approximately 575 linear feet of 8 pipe.
(C7009-CT) East Village Block 49 *Day Labor
Bld*
Details | Show on Map
640C7009Buildings2Complete the design, oversight, remediation and demolition
of the East Village Block 49 (610 E 9th)
135th & Cherry St. Sewer Main Extension
Details | Show on Map
89003727Sanitary Sewers6Construction of 1,245 feet of 8' sanitary sewer with 285
feet bored under 135th st. west of the Missouri Pacific
railroad to serve 22 properties and remove four of them
off septic tanks north of 135th st and along Cherry Ave..
Richards Gebaur Redevelopment
Details | Show on Map
89008172Streets6Management of design and construction of streets, storm
sewers, water, and sanitary sewers related to Richards Gebaur
development
Truman Road (Upper Viaduct) over Blue River
Details | Show on Map
89005470Bridges3Replace the bridge deck and repair the bridge substructures.
City Hall 22nd Floor Remodel
Details | Show on Map
890L0175Buildings2Complete renovation of the 22nd floor tenant space in City
Hall.Work consist of new HVAC system,  lighting, ADA
restrooms, fire sprinkler system, new interior finishes
with movable partition walls and new ergonomic furnishings. 
Space will accomodate the 12 memeber of the City Council
Building Demolition 1 Barry Road Section
2
Details | Show on Map
890A8078Streets2Building demolition along NW Barry Road and N Amity Avenue
for street improvement purposes. Construction work also
includes grading of the demolished site, removal of utilities,
seeding and other appurtenances as detailed and/or required,
and all necessary traffic control and incidental and related
Vivion Trail Phase 2 (South Side)
Details | Show on Map
89002902Trails / Paths1Project consists of design and construction of Phase 2 of
the Vivion Bicycle and Pedestrian Trail. The trail will
connect from the Anita Gorman Backyard Demonstration Garden
to the intersection of Vivion Road and Highland Avenue/Davidson
Road.
Erosion problem along East Creek
Details | Show on Map
82000070Storm Sewers2Erosion problem along East Creek, located from 169 Highway
to North Broadway along North 58th St. Perform the following:
a geomorphic reconnaissanse, data collection using a GIS
format or compatable format, data reduction and analysis.
Submit a letter report on the findings and intervention
NW 55th St.& NW Flint Ridge Rd. Sewer Ext
Details | Show on Map
89003618Sanitary Sewers2This project consists of the design of collection sanitary
sewers, joint district sanitary sewers and required appurtenances
in developed areas without public sewer access, currently
on septic systems.
NE 38th & N Brighton Sewers
Details | Show on Map
89003728Sanitary Sewers1Upgrading neighborhood on septic system to sanitary sewers
Independence Ave & Hardesty Intersection.
Details | Show on Map
89004098Streets1,3Intersection improvements for Independence Ave and Hardesty,
consisting of drainage, grading, realigning Hardesty, paving,
curbing, pavement marking, lighting, signalization, signing,
mast arms, pull boxes, traffic controller, conduits, and
other appurtenances.
East Bannister Road Interceptor
Details | Show on Map
81000215Sanitary Sewers5Construction of approximately 5,150 linear feet of sanitary
sewer in order to switch the subdivisions
of Wedgewood Pointe, Unity Ridge/Gardens, and Silvertooth
Fahey Farms off of the Boggs Hollow sewer (Lee's Summit)
and onto the East Bannister Interceptor (Kansas City).  
NE 68th St. & N Belmont Ave .
Details | Show on Map
89003453Sanitary Sewers1Design and Construct 4100 feet sanitary sewer extension
to serve 30 properties that are currently on private septic
systems. SD 22086-87.
Broadway Streetscape 6th to 14th
Details | Show on Map
64007003Streets2Design & construction of streetscape improvements
along Broadway Boulevard between 10th & 12th Streets
and portions of the block between 8th & 9th Street. 
Streetscape elements include decorative brick pavers on
sidewalks, street trees, & pedestrian lights.
(D7009-CT) East Village Block 81 *Remediation*
Details | Show on Map
640D7009Buildings2Complete the oversight of the East Village Block 81 Remediation
NW 64th-68th (Gower) Connector
Details | Show on Map
89001236Streets2Realign N. Gower to connect to NW64th Street with NW 68th
Street.
4139 N Drury Drainage
Details | Show on Map
89003795Storm Sewers1Extend existing storm sewer at the back lot line to stop
erosion of property at 4139 N. Drury.  This project
is bundled in construction with Project #3805.
Highway 40 & Marsh Sanitary Sewer
Details | Show on Map
89003646Sanitary Sewers3Updating neighborhood on septic system to sanitary sewers.
This project requires the completion of a Water Services
Department extension sewer prior to construction.
93rd & Hillcrest
Details | Show on Map
89008131Streets6Project includes approximately 700 linear feet of Hillcrest
roadway regrading to allow ingress and egress of fire trucks
from Fire Station 41.
809 W 109th Terr. Drainage
Details | Show on Map
89003810Storm Sewers6Extend the existing system approx 100' downstream from rear
yard of 809 W 109th Terrace. Part of 15SW PIAC bundle.
3001 NE Russell Road
Details | Show on Map
82000093Storm Sewers1Storm Drainage Improvement at 3001 NE Russell Road - Construct
detention pond to reduce area flooding.
55th Ter. & Byrams Ford Rd.
Details | Show on Map
89003837Storm Sewers5This project includes the construction of an enclosed storm
sewer system with new pipe and four field inlets along the
existing ditch located between the rear yard of 8325 E.
55th street and the side yard of 5513 Byrams Ford Road.
50th Terrace from 51st St. to Manchester
SDI
Details | Show on Map
89008147Storm Sewers5Reconstruct 200 feet of road, also construct curb, driveways,
on the south side of 50th Terrace from 51st Street to Machester
Trafficway.  This improvement is to solve a localized
flooding problem.
Beacon Hill Infrastructure Phase IIIB-Collonade
Details | Show on Map
640B7021Streetscape3Beacon Hill Phase IIIB-Collonade:  Beacon Hill developers
are working to property. This phase entails an entrance
alley and a through alley with parking to accomodate
Collonade Buildings fronting 27th Street.
Beacon Hill Infrastructure Phase IIIC-Drainage
Details | Show on Map
640C7021Streetscape3Beacon Hill Phase IIIC-Drainage:  Phase IIIc entails
construction of a water detention facilityCity Planning
and Development seeking grant money for funding. 
N Brighton Ave. Sec. 1A - Vivion Rd. to 58th
Street
Details | Show on Map
89002675Streets1This project includes the street widening of North Brighton
Ave from NE Vivion Road to NE 58th Street. This project
will include widening the road to a four lane divided median
section while flattening the hills and valleys, adding new
curbs and gutters, an enclosed storm sewer, street lighting,
Little Blue Road Improvements adjacent to
14001 Little Blue Road
Details | Show on Map
89008107Streets5Widen west bound Little Blue Road at Noland Road to provide
separate left and right turn lanes.  Establish ROW. 
22nd-23rd Corridor Sec 1A - McGee to Harrison
Details | Show on Map
89001213Streets4Geometric and roadway improvements along 22nd Street corridor
and construction of 23rd Street connector to Gilliam Road.
Consists of drainage, grading, paving, curbing, retaining
walls, street lighting, traffic signals and interconnection,
pavement marking, signing, landscaping and other amenities.
Streetscape Improvement East 10 Wyandotte-
Broadway Library District E
Details | Show on Map
89008132Streetscape2To develop construction plans and specifications for 10th
street between Wyandotte and Broadway.
1504 NE 80th Place
Details | Show on Map
89003845Storm Sewers2Stormwater improvement to provide bank stabilization of
the open channel, and to repair retaining wall, and prevent
further erosion that is potentially harmful to the homes.
Red Bridge over Blue River
Details | Show on Map
890B5464Streets6Red Bridge over Blue River
Red Bridge Road, Phase 2
Details | Show on Map
890C8054Streets6Red Bridge Road, Phase 2
18th & Paseo Parking Lot
Details | Show on Map
890A0233Parking Lot3This is a project to provide design services for a surface
parking lot at the southwest corner of 18th & The Paseo.
Bob Mohart Center Phase 1 - 3200 Wayne Str.
Details | Show on Map
89000404Buildings3The project consists of a renovation and addition to the
existing building.  This will include a new second
floor connecting corridor, elevator and stairway. 
Renovation to the existing rest rooms to be ADA compliant. 
Renovating the gymnasium, kitchen, corridors and stairs.
NE 44th Street and N. Brighton Ave.
Details | Show on Map
89003817Storm Sewers1Construction of approximately 650 l.f. of new storm sewer
from 4416 North Brighton to 4400 N. Brighton including the
replacement of the existing cross road pipes at 44th Street
and 44th Terrace, approximately 2 inlets and appurtenances
required to enclose
NE 96th St Bridge over East Fork Shoal Creek
Details | Show on Map
89005484Bridges1The existing bridge will be replaced with a prestress concrete
girder bridge. The new bridge will have shoulders and will
be constructed to comply with the future Shoal Creek Parkway
design that will have two, 12' traffic lanes and a bike-pedestrian
sidewalk.
Wornall & Locust near 131st Crossroad Drainage
Details | Show on Map
89003811Storm Sewers6Improve the channel between Locust and Wornall south of
Blue Ridge Boulevard. Replace the Wornall culvert south
of Blue Ridge. Includes realigning, deepening reinforcing
the channel where necessary to stop yard erosion, fence
replacements, yard restoration.
City Hall - Exterior Rehab
Details | Show on Map
890B0175Buildings2This project consist of 5 main improvements:  Construction
of fire-rated stairs towers from 2nd floor to street level;
New extended entry vestibukle at north entrance; New/improved
security control checkpoint; New ADA access to City Hall;
New north plaza and landscaping.Construction costs for this
NW Interurban Rd. Bridge over Todd Creek
Details | Show on Map
89005446Bridges2The new bridge will have a total of two spans and will
have two 12' traffic lanes with shoulders on both sides.
The new bridge will be constructed on a new alignment to
reduce the sharp horizontal curve and to improve the sight
distance.
44th Terr. & N Holmes
Details | Show on Map
89003706Storm Sewers1Construct an enclosed storm sewer from 44th Terrace &
Holmes southwest to the existing ditch on Park property
behind 4328 N Campbell.
Bartle Hall - N. Dock * (5 Phases)
Details | Show on Map
890A0284Buildings2This project involves demolition and reconfiguration of
dock to improve functionality plus provide visual screening
of dock from adjacent properties, including perimeter
and overhead views.  There will also be a new
streetscape, using the Downtown Streetscape Master
Bob Mohart Phase II
Details | Show on Map
890A0404Buildings3The interior renovation of the Bob Mohart Center
Kitchen, Storage, Janitor Storage, West Entry, Break Room
and Office Spaces on the First and Second level of the west
building.
Beacon Hill Infrastructure Phase IIIA
Details | Show on Map
64007021Streetscape3Conduit:Install conduit, ballards and KCP&L equipment
allowing power for future residents. IIIa,IIIb,IIIc: IIIa2 stub
alleys; storm water extension and 26th Street Construction within
boundaries of 24th to 27th Street and Troost Avenue to
Paseo Blvd.   (possible 26th Street Watermain
3810 Ditzler Storm Drainage
Details | Show on Map
89003774Storm Sewers3Design and construct a stormwater drainage improvement to
alleviate runoff flooding the property and eroding the roadway
ditch. Water Services to pay additional estimated $35,000
for water main relocation.
TriangleTrail (Santa Fe Trail-Scott Pk-US71)
Details | Show on Map
89020065Trails / Paths6Design, Right-of-Way, and Construction of Trail to Scott
Park from Missouri Department of Transportations Trail along
Missouri Highway 71 ending along 98th Terrace.
NW Barry Rd (West of I-29) Sec 2 - N Conant
to Amity
Details | Show on Map
89008078Streets2This project includes the widening of NW Barry Road from
N. Potomac to N. Conant Avenue and includes the widening
of N Amity Ave. from NW Barry Road to M-152 including the Barry
Road over Rush Creek (Project 89005408) and N. Amity
Culverts (Project 89005487). A four lane undivided-median
Frost Road Bridge over small creek
Details | Show on Map
89005497Bridges5Replace existing box culvert .  Combined with 89005501.
48th St. & Logan Ave. Sewer Ext
Details | Show on Map
89003611Sanitary Sewers5
620 W 85th Ter & Summit Sec 2 - W 86th Terr.
& Belleview - Ward Pkwy.
Details | Show on Map
89003719Storm Sewers4Construct approximately 5,400' of storm sewer, ranging in
size from 42'' to 54'' in diameter, curb inlets and piping,
grated inlets, junction boxes, seeding and sodding, 
and street restoration, all along Belleview Ave. from 86th
Terrace to 88th Street from Belleview Ave. to Ward Parkway
(A7009-CT) East Village Block 100 *Bus Depot*
Details | Show on Map
640A7009Buildings2Complete the design, oversight, remediation and demolition
of the East Village Block 100 (Sports Castle and Greyhound
Building)
NE 39th St. & Prather Rd. Sewer Ext
Details | Show on Map
89003566Sanitary Sewers1Design and construct sanitary sewer extension to remove
residential properties from private septic systems and connect
them to public sewers.
56th Street and Bellefontaine Ave.
Details | Show on Map
89003830Storm Sewers5Storm drainage improvements at this location consist of
the construction of approximately 510 l.f. of new storm
sewer along the back of 5614 and 5604 Bellefontaine Avenue
and the existing right-of-way of 56th Street to Town Fork
Creek, approximately 4 inl
N Oak Tfwy. (Sec. 2) 96th St. to 111th St.
Details | Show on Map
89008000Streets2Proposed improvements for Phase II, from NE 96th St. to
NE 111th St., will include widening the street to four lanes,
adding turn lanes at busy intersections, putting sidewalks
on both sides of the street, flattening out the road and
removing blind spots, adding curb cuts for wheel chairs,
56th & Bennington Sanitary Sewer Replacement
Details | Show on Map
810B0292Sanitary Sewers5 This project will replace the existing tightline sewer
with a sanitary sewer for residents near the area of 55th
St. & Bennington Ave. This project is being designed
as an addendum to WSD Proj. No. 81000292 and will tie into
the completed CIMO Proj. No. 89003562. Construction of this
Vehicle Processing Facility-VIF
Details | Show on Map
890A0502Buildings1Vehicle PROCESSING Facility-VIFThe Project includes development
and construction of an approximately 5100 SF building for
a Vehicle Processing Facility for the Kansas City The building
will be located on the VIF complex and will feature
3 drive-through bays, an oversized evidence gathering bay,
Swope Parkway Building 1st & 4th Floor
Details | Show on Map
57000140Buildings5Re-design vacant space on the 1st Floor and 4th Floor at4900
Swope Parkway; Order furniture to support existing and new
position.  Also, design space on 4th floor City Hall
to accommodate employees being transferred from 2534 Prospect. 
Redesign space at 2534 Prospect to accommodate employees
18th & Vine Retail Improvement - North Vine
Commercial Spaces
Details | Show on Map
64006344Buildings3Assist the jazz district redevelopment corporation for the
construction to 13,000 square feet of commercial storefront
spaces in 18th & Vine district.  Scope of work
consist of completing concrete floor slabs, building demising
partitions, acoustical ceiling, general lighting, restrooms,
39th & Blue Ridge Cut-off
Details | Show on Map
89003370Sanitary Sewers3Construct sanitary sewers for neighborhood on septic systems. 
This work includes upgrading approximately 1550 linear feet
of 6" waterline.
55th & Bennnington Sanitary Sewer Phase 2
Details | Show on Map
89003790Sanitary Sewers5Design and Construct 4100 feet sanitary sewer extension
to serve 30 properties that are currently on private septic
systems.
NE Reinking Road Bridge over tributary of
Shoal Creek
Details | Show on Map
89005460Bridges1Replacement of  the existing bridge with a reinforced
concrete box culvert with a re-alignment of the existing
roadway to provide for creek stabilization.
Colorado Ave. Bridge (Lower Blue Parkway
Bridge over Blue River)
Details | Show on Map
89005537Bridges5Also known as the New Lower Blue Parkway Bridge.  This
bridge will be a steel plate girder bridge with concrete
pavement .  The bridge will replace the former lower
Blue Parkway Bridge and connect Bluebanks Avenue with the
relocated Manchester Trafficway and subsequenstly Blue Parkway.
Leeds Rd. & Hunter Ave. SD 10059
Details | Show on Map
89003372Sanitary Sewers3Design and construction of 2900 feet of gravity Sanitary
sewer extension. The sewer will serve 37 parcels of land
and benefit approximately 30 households. SD 10059.
StreetScape Improvements Town Pavillion
Details | Show on Map
64008053Streets2No project scope.
Kansas City Zoo - Red Barn
Details | Show on Map
70050004CPublic Spaces5 The Scope of Work includes the complete renovation
of the exisitng Red Barn.  The Red Barn is a new Kids
Zone complete with small animal exhibits and interactive
events for children. 
Blue River Road Bridge over small creek
Details | Show on Map
89005490Bridges6This project includes the replacement of an existing eleven-span, five-girder
cast-in-place, concrete bridge with a five-span prestressed
concrete beam bridge over Hickman Mills Creek. The existing
roadway is 40' and the proposed bridge would be 44'.
Red Bridge Road repair
Details | Show on Map
890A5464Streets6No project scope.
23rd St. Bridge Near Kemper Arena
Details | Show on Map
89005406Bridges2Major repairs to the 23rd street viaduct and removal of 
Wyoming Street Viaduct.
Wornall Road Bridge over Brush Creek - Repairs
Details | Show on Map
89005451Bridges4This project is a bridge rehabilitation of a 3-span continuous
slab concrete bridge. The major repairs consist of brick
pavers, concrete, shotcrete, concrete paint and coating,
water proofing membranes (chemical & physical barriers),
drainage system (bri
FIRE STATION 35
Details | Show on Map
89000035Buildings5This facility is classified as a new facility. The station
will be designed to the Modified Battalion Headquarters
Space Allocation Standards. This project will construct
a fire station that will house 1 Battalion Chief, 3 Captains,
and 11 fire fighters. The facility will have an  appratus
8216 to 8218 Ruskin Way Drainage
Details | Show on Map
89003809Storm Sewers6Perform study for the design and construction of new
curb, two curb inlets, 130' of pipe and two drive approaches
at 8216 and 8218 Ruskin Way.
48th & Vermont
Details | Show on Map
89003829Storm Sewers5Construct curb and regrade intersection to drain properly.
Part of 15SW PIAC bundle.
2nd Street Improvements
Details | Show on Map
64005007Streets2This project is to design and construct improvements
on 2nd Street between Oak Street & Delaware Street
located in the River Market District.  Improvements
will include the seperation of storm & sanitary
sewers & the creation of a new asphalt street including
(B7009-CT) East Village Block 82/49 *Bail
Bond Bld/Day Labor Bld*
Details | Show on Map
640B7009Buildings2Complete the design, oversight, remediation and demolition
of the East Village Block 82 (Bail Bond/Day Labor Building)
Gregory Blvd. & McGee Street Storm Sewer
Details | Show on Map
89003827Storm Sewers4The proposed construction consists of new storm inlets and
storm sewers along McGee St.  beginning at the intersection
of Gregory and extending approximatley 150 feet to the south.
Corinthian Hall-Door & Window Renovation
& Replacement
Details | Show on Map
890B0190Buildings1 In the Main Museum building and Carriage House:Project
includes removal of existing windows and doors and framing.
New Historical-profile windows & doors will be installed
on the main floor, basement and the upper two floors. The
two existing bronze doors will be cleaned and restored on
11th & Oak Garage Sign Study
Details | Show on Map
890B0178Buildings2Perform an investigation into the application of way
finding signs in the George E. Wolf parking garage located
at 11th and Oak Street.  The investigation will look
into using various signs and signage techniques to assist
in regulating traffic flow during high volume traffic periods,
St. John/ Benton Blvd. Entryway Phase 1
Details | Show on Map
89060081Streets1Design & construct an improvement to the intersection
of St. John Avenue & Benton Boulevard.  The
purpose of the project is to improve vehicular &
pedestrian safety & to create a gateway into the
St. John corridor & the Kansas City Museum.
31st St. Bridge over Wyandotte near Penn
Valley Park
Details | Show on Map
89005422Bridges4Replace the existing bridge with a three span prestress
girder bridge with curtain walls for the two side spans.
7601 NW 79th Place Drainage
Details | Show on Map
89003844Storm Sewers2Stop soil erosion and flooding of backyard.
Decorative Fence Caps Broadway Bridge over
1-70
Details | Show on Map
640A6100Bridges2Project consists of installation of decorative metal caps
on the posts for the railing on the Broadway bridge over
I-70.
80th & Lydia to 81st & Lydia Drainage
Details | Show on Map
89003805Storm Sewers5Design and construct a properly sized pipe north 135' and
east 45' from a field inlet to intercept water flooding
house.
87th Street Section 1 - U71 to Denver
Details | Show on Map
89008037Streets6This project includes federal funding and is being completed
wiht MoDOT's review and oversight. The plans include the
removal of the existing 2-lane roadway with the replacement
to a 4-lane divided and undivided roadway on a straightened
alignment. The roadway improvements consist of the realigning,
Sni-A-Bar Bridge over KCSRR
Details | Show on Map
89005425Bridges5Replacement of single span open spandrel arch bridge with
a 3 span pre-stressed concrete girder bridge. This bridge
extends over KCSRR. There will be a realighment of approx.
245 LF of Eastwood Place and 1100 LF of Sni-A-Bar Road.
Additional ROW will have to be acquired.
Blue Pkwy Bridge over Blue River
Details | Show on Map
89005465Bridges5Replace the exsiting bridge with a 1100 ft long steel plate
girder bridge with shoulders.
801 NE Cookingham Dr.-Lakeside Drainage
Details | Show on Map
89003851Storm Sewers2Remove approximatley 500 l.f. existing storm sewer along
project alignment and improve approximatley 1,000 l.f. of
the storm sewer drainageway with storm sewer pipe or an
improved open channel.  Reconstruct existing roadway
and sidewalks at 2 roadway crossings.
Union Hill S/Scape - Storm Sewer
Details | Show on Map
64007019Streetscape4The project includes Storm and Sanitary Sewer with associated
inlets, piping, manholes and fixtures in the Founders at
Union Hill Development.  Areas of work are 30th Street
near Gillham Road; another at 29th Street and McGee Street;
and another along McGee Street near Gillham Road.
48th & Emery
Details | Show on Map
89003613Sanitary Sewers5Sanitary sewer project for sewer district #13052.
Building Demolition 2 Barry Road Section
2
Details | Show on Map
890B8078Streets2One resident home demolition @ 8911 NW Barry Road
for NW Barry Rd. Sec 2 improvements.
NW 73rd St Bridge over small creek
Details | Show on Map
89005498Bridges2Replace the existing structural deficient bridge with a
concrete arch structure and reconstruct approach roadway
to improve sight distance.
Downtown Entertainment District / KC Live
Details | Show on Map
KC LiveBuildings2The City is responsible for a large portion of the Power
& Light District's development as well as overall project
and traffic flow management. This includes the purchase
all the property; vacation of the alleys, and demolition
and environmental abatement in the existing buildings and
Animal Shelter
Details | Show on Map
89000380Buildings5The Animal Shelter Office Renovation will include a cosmetic
upgrade of all interior flooring, lighting, painting and
new systems furniture to create spaces that are workable
for staff.  A new ADA accessible public restroom and
staff rest room will be included along with upgrades to
NW 64th-68th (Gower) Demolition
Details | Show on Map
890A1236Streets2Two residential home demolitions on NW Waukomis Drive (6836
& 6840) for NW 64th - 68th Connector Street Improvements.
18th & Vine Gateway Sign
Details | Show on Map
890D0233Streetscape3This project provides preliminary design services to determine
the basis of construction documents for landmark signs at
the east and west entrance to the 18th & Vine Jazz District.
The design will also include an outdoor terrace in the District
on partitioned project number 890C0233
526 S Topping Avenue
Details | Show on Map
89003819Storm Sewers1Grade back alley, construct inlets and storm sewer as nececessary
to properly drain area and tie into existing storm sewer
system. Part of 15SW PIAC bundle.
104th Ter. and Walnut Drive
Details | Show on Map
89003840Storm Sewers6Reconstruct approximately 520' of lined open channel with
grade and erosion control along the back lot lines between
Walnut Drive and Grand Avenue (10420 Grand to 10501 Walnut
Drive. Part of 15SW PIAC bundle.
FIRE STATION 18
Details | Show on Map
89000018Buildings3This facility is classified as a complete remodel and will
be designed to the Standard Station Space Allocation Standards.
This remodel will include the replacement of all mechanical,
electrical, lighting, plumbing fixtures, and equipment. 
Currently project is to be carried through design.
New Metro Patrol 1% for Art
Details | Show on Map
890A1931Public Art5No project scope.
N Amity Road over Rush Creek, Sec 2
Details | Show on Map
89005487Bridges2This project includes the widening of NW Barry Road from
N. Potomac to N. Conant Avenue and includes the widening
of N Amity Ave. from NW Barry Road to M-152 including the Barry
Road over Rush Creek (Project 89005408) and N. Amity
Culverts (Project 89005487). A four lane undivided-median