Project NameProject NumberProject TypeCouncil DistrictScope of Work
NW 64th-68th (Gower) Connector
Details | Show on Map
89001236Streets2Realign N. Gower to connect to NW64th Street with NW 68th
Street.
N Brighton Ave. Sec. 1A - Vivion Rd. to 58th
Street
Details | Show on Map
89002675Streets1This project includes the street widening of North Brighton
Ave from NE Vivion Road to NE 58th Street. This project
will include widening the road to a four lane divided median
section while flattening the hills and valleys, adding new
curbs and gutters, an enclosed storm sewer, street lighting,
Raytown Rd. Bridge over Round Grove Cr (E)
Details | Show on Map
89005447Bridges5The new bridge will have a total of three spans and will
be constructed on the existing alignment.
N Oak Tfwy. (Sec. 2) 96th St. to 111th St.
Details | Show on Map
89008000Streets2Proposed improvements for Phase II, from NE 96 th St. to
NE 111 th St., will include widening the street to four
lanes, adding turn lanes at busy intersections, putting
sidewalks on both sides of the street, flattening out the
road and removing blind spots, adding curb cuts for wheel
NW Barry Road- section 1B2 N Conant to N
Congress
Details | Show on Map
89008124Streets2This project includes the widening of NW Barry Road to
a four lane divided median section with curbs and gutters,
an enclosed storm sewer, street lighting, bike lanes and
sidewalks.
NW Hampton Road Bridge over Brush Creek
Details | Show on Map
89005500Bridges2Replace the existing bridge with a concrete arch structure
and also reconstruct the approach roadway.
American Royal Drive Ramp Rehabilitation
Details | Show on Map
89005495Bridges2  Replace the bridge and Column No.2.
Colorado Ave. Bridge (Lower Blue Parkway
Bridge over Blue River)
Details | Show on Map
89005537Bridges5Also known as the New Lower Blue Parkway Bridge. 
This bridge will be a steel plate girder bridge with concrete
pavement .  The bridge will replace the former lower
Blue Parkway Bridge and connect Bluebanks Avenue with the
relocated Manchester Trafficway and subsequenstly Blue Parkway.
23rd St. Bridge Near Kemper Arena
Details | Show on Map
89005406Bridges2Major repairs to the 23rd street viaduct and removal of 
Wyoming Street Viaduct.
N Bennington- Parvin Rd to NE 48th Street
Details | Show on Map
89008157Streets1Collector street upgrade from Parvin Rd to NE 48th Str.
Including additional lanes, water main relocation, and underground
utilities
Fire Station 4 - Bunkhouse Renovations
Details | Show on Map
89000004Buildings2This project is a renovation of the bunk room for the fire
station to add personal. The work is needed to accommodate
the ambulance personal and is in need of a quick turn around
by the contractor to meet commitments by the Fire Department
to the personal.  Contractor will move out all beds,
Forrester Viaduct over Railroad
Details | Show on Map
89005438Bridges2Replacement of a 15 Span Rolled Steel Wide Flange Bridge.
This bridge extends over the Union Pacific Railroad, Santa
Fe, and Mulberry Streets. There will be access provided
on 9th Street, St. Louis Ave., Union Ave., Beardley Road,
and Union Ave.
12th St. Viaduct over Railroad (Phase 3)
Details | Show on Map
89005442Bridges2Repair the bridge superstructure including bridge deck,
expansion devices, and railings.
Sni-A-Bar Bridge over KCSRR
Details | Show on Map
89005425Bridges5Replacement of single span open spandrel arch bridge with
a 3 span pre-stressed concrete girder bridge. This bridge
extends over KCSRR. There will be a realighment of approx.
245 LF of Eastwood Place and 1100 LF of Sni-A-Bar Road.
Additional ROW will have to be acquired.
Blue Ridge Blvd & 107th Street Geometric
and Signal Improvement
Details | Show on Map
89004421Traffic Signals6Upgrade existing controller and installation of new signal
equipment, and intersection geometrics to provide left turn
lanes on Blue Ridge Blvd.
Blue Pkwy Bridge over Blue River
Details | Show on Map
89005465Bridges5Replace the exsiting bridge with a 1100 ft long steel plate
girder bridge with shoulders.
James St. Bridge over Railroad Yard
Details | Show on Map
89005496Bridges2Rehabilitate deck and other superstructure items. 
Evaluate structural integrity of railroad span.
58th St. Bridge over KCSRW
Details | Show on Map
89005443Bridges5Replacement of the existing wood trestle bridge with a
new bridge that will have two, 12' lanes to span the Kansas
City Southern Railroad tracks.
22nd-23rd Corridor Sec 1B - Tracy to Brooklyn
Details | Show on Map
89008008Streets3Geometric and roadway improvements along 22nd Street corridor
from Tracy to Brooklyn, consisting of drainage, grading,
paving, curbing, retaining walls, street lighting, traffic
signals and interconnection, pavement marking, signing,
landscaping, and other amenities.
(E7009-CT) East Village Block 81 *Parking
Garage*
Details | Show on Map
640E7009Buildings2Construction of the East Village Block 81 Parking Garage
(Design-Build)
NE Reinking Road Bridge over tributary of
Shoal Creek
Details | Show on Map
89005460Bridges1Replacement of  the existing bridge with a reinforced
concrete box culvert with a re-alignment of the existing
roadway to provide for creek stabilization.
Troost Ave. Bridge - 47th Terrace Roadway
Improvements
Details | Show on Map
89035467Bridges4Troost Ave. Bridge - 47th Terrace Roadway Improvements
North Congress Street Improvements - 73rd
to Hwy. 9
Details | Show on Map
89008091Streets2This portion of N Congress serves as a collector road and
is a Phase III bike route. Row varies from 32 to 60'. The
bridge has been surveyed as needing maintenance. The creek
is a Zone A regulated floodplain that drains down to Parkville. 
Red Bridge over Blue River
Details | Show on Map
890B5464Bridges6Red Bridge over Blue River   Construct a new bridge
on Red Bridge Road to span over Union Pacific Railroad and
the Blue River. Proposed new bridge will have two traffic
lanes, sidewalk, and a multi use trail.
Red Bridge Road, Phase 2
Details | Show on Map
890C8054Streets6Red Bridge Road, Phase 2 Improve Red Bridge Road from Blue
River Road to Grandview Road.  A 3 lane typic section
is being proposed for this section of Red Bridge Road. 
Other improvements include adding curb, sidewalk and etc.
11th & Oak Garage Operating Systems
Details | Show on Map
890D0178Buildings2This involves replacement of all the parking equipment,
motors, arms, controllers, and replacing with new parking
control system.   HOW DOES THIS REDUCE LONG TERM MAINTENANCE
Eliminate the cost for emergency repairs Reduction in loss
revenue when system is not operating.   CURRENT ONGOING
(A7009-CT) East Village Block 100 *Bus Depot*
Details | Show on Map
640A7009Buildings2Complete the design, oversight, remediation and demolition
of the East Village Block 100 (Sports Castle and Greyhound
Building)
Improvements to Front Street at VIF
Details | Show on Map
890B0502Streetscape1The project to includes designing and documenting some
improvements on Front Street, from Chouteau to Universal. 
The improvements will include signage and civil scopes.
This work was part of an agreement with Northeast Industrial
Association by resolution no. 060233
Performing Arts Center Parking Garage
Details | Show on Map
870PAC01Buildings2The Arts District Garage will be located just south of
the New Preforming Arts Center, bound by 17th street on
the south, Broadway on the west and Wyandotte St. on the
east. This 1,000 car facility is completely an underground
garage that includes parking accessible for the new Preforming
FIRE STATION 39
Details | Show on Map
230A0039Buildings5New (three bay) fire station replacement of existing No.
39 at 10003 E. 47th St. New Station will be built at 47th
& Sterling. The structure will be a new building
which will include a day room and kitchen area, sleeping
quarters and office for captains and fire staff,
Vehicle Processing Facility-VIF
Details | Show on Map
890A0502Buildings1The Project includes development and construction of an
approximately 5100 SF building for a Vehicle Processing
Facility for the City of  Kansas City located at the
Vehicle Impound Facility.
NE Indiana-Vivion to Gladstone City Limits
- Bridge
Details | Show on Map
89005542Bridges2Provide preliminary and ROW(60%) plans for replacing bridge
on N. Indiana just south of NE 55th St. and to improve roadway
along N. Indiana from NE Vivion Rd. to the Gladstone city
limits.
(B7009-CT) East Village Block 82/49 *Bail
Bond Bld/Day Labor Bld*
Details | Show on Map
640B7009Buildings2Complete the design, oversight, remediation and demolition
of the East Village Block 82 (Bail Bond/Day Labor Building)
Municipal Auditorium Garage Floor
Details | Show on Map
630A0291Buildings2DESCRIPTION OF FACILITY: .   This space is directly
adjacent to the Garage and provides walking access to the
hotels and Convention Center. This connects to the main
lobby adjacent to the Directors Office of the Convention
Center. The Garage Walk way allows customers parking in
Locust & Cherry Island Improvements
Details | Show on Map
89020187Streetscape4Design and construct improvements to the Crestwood neighborhood
island at Locust and Cherry.  Improvements include
decorative wall, sitting bench, signage, decorative sidewalk
and landscaping.
NE 96th St Bridge over East Fork Shoal Creek
Details | Show on Map
89005484Bridges1The existing bridge will be replaced with a prestress concrete
girder bridge. The new bridge will have shoulders and will
be constructed to comply with the future Shoal Creek Parkway
design that will have two, 12' traffic lanes and a bike-pedestrian
sidewalk.
KC Business Assistance Center
Details | Show on Map
070C0178Buildings2The Business License Team will be relocating their services
to the Oak Garage sharing space together with BizCare.
DEMO 83rd Street Bridge
Details | Show on Map
890A5474Bridges5Demolition of 83rd Street Bridge over Kansas City Southern
Railroad tracks. 
Blue Parkway at Eastwood Trafficway
Details | Show on Map
89005536Bridges5Improvements to Blue Parkway and Eastwood Trafficway, including
box culvert replacement and improvements to the intersection
and traffic signals. Project currently funded through Design
only.
New Metro Police Station
Details | Show on Map
89000931Buildings5This facility is classified as a new facility. The
location of the station will be in the approximate area
of 77th Street and Prospect Ave. in the East Meyer 7 and
Marlborough East neighborhoods. The new Metro Patrol Station
will replace an existing station to cover the population
Bannister Rd & Blue Ridge Blvd Geometric
and Signal Improvement
Details | Show on Map
89004283Traffic Signals6Geometric improvements and traffic signal modifications
at Bannister Road and Blue Ridge Blvd. Consisting of adding
left turn lanes and installation of mast arms, cameras,
pull boxes, traffic controller, conduits, and other necessary
appertunances.
87th St - Section 2 - 1.2 Miles E of BRW
Details | Show on Map
89008113Streets6Roadway improvements consist of the realigning, widening,
paving, replacing curbs and gutters, sidewalks, storm and
sanitary sewers, water main relocation, and other appurtenances
along with the addition of roundabouts at both I-435
intersections, Hillcrest Road and Newton Avenue for this
Bob Mohart Phase III
Details | Show on Map
890B0404Buildings3 Robert J. Mohart Phase III Project will encompass
the Renovation of the South Parking Lot and Site Paving,
upgrades to the lighting and sound in the Auditorium and
Multipurpose Room and various interior patching and painting
to walls, replacement of lighting and ceiling tile in the
Troost Ave. Bridge (8905467ST)
Details | Show on Map
89005467Bridges4Replace the Troost Avenue Bridge in connection with Brush
Creek Flood Control. This bridge must accommodate a potential
mass transit corridor along Troost Avenue.
93rd & Hillcrest
Details | Show on Map
89008131Streets6Construct exit for Fire Station 41.  Improve stormwater
drainage.
Bartle Hall Operating Wall
Details | Show on Map
630B0284Buildings2DESCRIPTION OF FACILITY: The operable walls in the Exhibit
Halls allow the space in the exhibit hall to be divided
for multi tenants and events. One of the walls is in conditions
that has reached its life and needs replaced.   DESCRIPTION
OF PROJECT SCOPE: This full extension and full height (
Signal Synchronization Center - Phase II
Details | Show on Map
89004361Buildings1The City's Transportation Operations Center building located
on 5310 Municipal Drive will be remodeled to house the new
Signal Synchronization Center .   This operation will
provide better signal timing in the Kansas City area.  
Funding for this project comes from the Missouri Department
Marlborough Neighborhood Sign
Details | Show on Map
64007105Public Spaces5Fabricate and install neighborhood signage for the Marlborough
Neighborhood.
Bartle Hall Exhibit Hall Restrooms
Details | Show on Map
630C0284Buildings2Bartle Hall - Exhibit Hall Restrooms This includes the
upgrade of 16 Restrooms on the Exhibit Floor. Scope Includes
Plumbing, wall treatment, electrical and painting.
Troost Ave. Bridge - Pedestrian Bridge
Details | Show on Map
89015467Bridges4Pedestrian Bridge and Sanitary Sewer improvements
New South Patrol Police Facility
Details | Show on Map
07000162Buildings6BACKGROUND The new South Patrol Facilities includes: a
new Patrol Station, SOD (Special Operations)   Canine
Unit, and a Multi-purpose building. This Campus will
be a state-of-the-art, providing a secure and protected
work environment while maintaining an open and inviting
NW Barry Rd (West of I-29) Sec 2 - N Conant
to Amity
Details | Show on Map
89008078Streets2This project includes the widening of NW Barry Road from
N. Potomac to N. Conant Avenue and includes the widening
of N Amity Ave. from NW Barry Road to M-152 including the Barry
Road over Rush Creek (Project 89005408) and N. Amity
Culverts (Project 89005487).   A four lane undivided-median
N Brighton -M210 to Parvin Road
Details | Show on Map
89008112Streets1Geometric and roadway improvements in establishing a three
lane improvement on N. Brighton from Parvin to M210. Improvements
will consist of drainage, grading, paving, curbing, retaining
walls, street lighting, pavement marking, signing, landscaping
and other amenitities.
Municipal Court Building Upgrades
Details | Show on Map
27000174Buildings2Municipal Court was built in the 1970's and very little
work has been completed over the years to upgrade the facility.
This upgrade will provide new wallcovering, painting and
new flooring. An upgrade to restrooms on the first, second
and third floor will include new plumbing fixtures, wall
Chouteau Parkway
Details | Show on Map
70400001ParkWay1Construction of 4-Lane Parkway standard road from 210 Highway
to I-35.  Includes new 4-lane pavements, storm drainage,
box culverts, signals, lighting, trails, sidewalks, landscaping,
rain gardens and other aesthseitic improvments.
Municipal Auditorium Flooring
Details | Show on Map
630B0281Buildings2DESCRIPTION OF FACILITY: The flooring in the Lower Level
Lobby has created a dangerous condition with the terrazzo
flooring.   This space is directly below the Music
Hall main lobby adjacent to the Directors Office of the
Convention Center.   DESCRIPTION OF PROJECT SCOPE:
Troost Bridge - Pedestrian Improvements (8925467ST)
Details | Show on Map
89025467Bridges4Troost Bridge Transportation enhancements
Red Bridge Road, Phase 1
Details | Show on Map
890B8054Streets6Red Bridge Road, Phase 1 Improve Red Bridge Road from Holmes
Road to Blue River Road. A 3 lane typical section will be
used for this section of Red Bridge Road. Other improvements
include adding curb, sidewalk, and a mutil use trail. 
Raytown Rd. Bridge over Round Grove Cr (W)
Details | Show on Map
89005448Bridges5Replacement of the existing bridge with a three span prestress
girder bridge with shoulders. The new bridge will be built
on the existing alignment.