149 projects found.  
Project NameProject NumberProject TypeCouncil DistrictScope of Work
NW Hampton Road Bridge over Brush Creek
Details | Show on Map
89005500Bridges2Replace the existing bridge with a concrete arch structure
and also reconstruct the approach roadway.
N Brighton Ave. Sec. 1A - Vivion Rd. to 58th
Street
Details | Show on Map
89002675Streets1This project includes the street widening of North Brighton
Ave from NE Vivion Road to NE 58th Street. This project
will include widening the road to a four lane divided median
section while flattening the hills and valleys, adding new
curbs and gutters, an enclosed storm sewer, street lighting,
N Brighton Avenue East Bridge over Mill Creek
Details | Show on Map
89005459Bridges1The widening of North Brighton Ave from Vivion Road to NE
58th Street (Project # 2675) will require the replacement
of the bridge over Mill Creek. This project will include
the Northbound bridge to be replaced over Mill Creek. 
The Southbound bridge replacement will be completed with
New Metro Police Station
Details | Show on Map
89000931Buildings5This facility is classified as a new facility. The
location of the station will be in the approximate area
of 77th Street and Prospect Ave. in the East Meyer 7 and
Marlborough East neighborhoods. The new Metro Patrol Station
will replace an existing station to cover the population
Santa Fe Trail - Wornall Road to Pennsylvania
Street
Details | Show on Map
89008129Streets6The scope of the project is design and construction
of curbs amd storm inlets along Old Santa Fe Road between
Wornall and Pennsylvania.  Old Santa Fe will be widened
at Wornall for a left turn lane.  A 10' wide pedestrian
trail will be added on the south side of the road, with a
PW 3605 Sanitary Sewer extension in the vicinity
of 48th Terrace and Logan Avenue
Details | Show on Map
81000248Sanitary Sewers5PW 3605 Sanitary Sewer extension in the vicinity of 48th
Terrace and Logan Avenue, Project #3605, Sewer District
#13050, in Kansas City, Jackson County, Missouri. The project
will serve 7 property owners, 8 parcels of land, and consist
of approximately 735 linear feet of 8 pipe.
PW 3668 Sanitary Sewer extension in the
vicinity of 59th Street and Norfleet Road.
Details | Show on Map
81000253Sanitary Sewers5PW 3668 Sanitary Sewer extension in the vicinity of 59th
Street and Norfleet Road, Project #3668, Sewer Districts
#13045-13046, in Kansas City, Jackson County, Missouri.
The project will serve 21 property owners, 24 parcels of
land, and consist of approximately 1995 linear feet of 8
22nd Street/Baltimore to Cesar Chavez
Details | Show on Map
89008084Streetscape4Improvements along 22nd Street from Baltimore to Cesar Chavez.
Improvements will include 25' 4' wide asphalt street with
standup curb, paver sidewalk and crosswalks, pedestrian
and street lighting, drainage, landscaping, pavement marking,
signs. Scope modified to include work on 21st &
NE 55th St. & N Bennington Ave.
Details | Show on Map
89003768Sanitary Sewers1Design and construct sanitary sewer extension to remove
residential properties off private septic systems. Water
main relocation to be funded separately.
11th & Oak Garage Signage
Details | Show on Map
890B0178Buildings2Perform an investigation into the application of way
finding signs in the George E. Wolf parking garage located
at 11th and Oak Street.  The investigation will look
into using various signs and signage techniques to assist
in regulating traffic flow during high volume traffic periods,
Ruskin Heights Sewer Rehab - Rehabilitation
of sewer lines including all manholes in
Details | Show on Map
81000181Sanitary Sewers6The Rehabilitation/Replacement of approximately 37,240 linear
feet of 8-inch Vitrified Clay Pipe (VCP), 800 linear feet
of 10-inch Vitrified Clay Pipe (VCP), 4608 linear feet of
12-inch Vitrified Clay Pipe (VCP), 996 linear feet of 15-inch
Vitrified Clay Pipe (VCP) and the rehabilitation of all
PW 3530 Sanitary Sewer extension in the
vicinity of NE 48th and N Bristol Avenue
Details | Show on Map
81000255Sanitary Sewers1PW 3530 Sanitary Sewer extension in the vicinity of NE 48th
and N Bristol Avenue, Project #3530, Sewer District #2100,
in Kansas City, Clay County, Missouri. The project will
serve 8 property owners, 8 parcels of land, and consist
of approximately 1130 linear feet of 8 pipe.
Red Bridge Road Alternative Study
Details | Show on Map
890A8054Streets6The engineering study will examine the 2.8 mile section
ofRed Bridge Road from Holmes Road to Grandview Road and
provide design alternatives to the existing engineering
study completed in August 2004.  This portion of Red
Bridge Road includes three signalized intersections, an
12th Streetscape from Wyandotte to Locust
Details | Show on Map
64006107Streetscape2Design and build streetscape improvements for seven
block stretch of 12th Street from Wyandotte to Locust, modeling
the design from reccommendations in the Downtown
Streetscape Masterplan.
Hwy 40 & Marsh Ave. (connection/extension)
Details | Show on Map
81000309Sanitary Sewers3Construct an outfall sanitary sewer to tie a collection
sanitary sewer into the City sewer main.
Gracemor Storm Drainage Improvements
Details | Show on Map
82000075Storm Sewers1Gracemore Storm Drainage Improvements - Phase 19PIAC Project
to acquire right-of-way/construct storm drainage between
NE 55th & NE 56th St. East of N.Potter
NE Indiana-Vivion to Gladstone City Limits
- Bridge
Details | Show on Map
89005542Bridges2Provide preliminary and ROW(60%) plans for replacing bridge
on N. Indiana just south of NE 55th St. and to improve roadway
along N. Indiana from NE Vivion Rd. to the Gladstone city
limits.
81st Street and Brooklyn Avenue
Details | Show on Map
89003836Storm Sewers5Storm drainage improvements near 2215 E. 81st Street consist
of the construction of new curbs, storm sewer, inlets and
grading improvements. Part of 15SW PIAC Bundle.
COLE GROVE SEWER REHAB - Rehab of approx
247 linear ft of 33 1 114 linear ft of
Details | Show on Map
81000161Sanitary Sewers5Rehabilitation of approximately 440 linear feet of 33-inch,
900 linear feet of 36-inch, 165 linear feet of 42-inch,
1,230 linear feet of 48-inch, and 815 linear feet of 54-inch
segmented clay tile sewer, 20 manholes and the installation
of 4 junction boxe
18th & Vine Retail Improvement - North Vine
Commercial Spaces
Details | Show on Map
64006344Buildings3Assist the jazz district redevelopment corporation for the
construction to 13,000 square feet of commercial storefront
spaces in 18th & Vine district.  Scope of work
consist of completing concrete floor slabs, building demising
partitions, acoustical ceiling, general lighting, restrooms,
Erosion problem along East Creek
Details | Show on Map
82000070Storm Sewers2Erosion problem along East Creek, located from 169 Highway
to North Broadway along North 58th St. Perform the following:
a geomorphic reconnaissanse, data collection using a GIS
format or compatable format, data reduction and analysis.
Submit a letter report on the findings and intervention
PW 3611 Sanitary Sewer extension in the vicinity
of 48th Street and Logan Avenue. The project
Details | Show on Map
81000252Sanitary Sewers5PW 3611 Sanitary Sewer extension in the vicinity of 48th
Street and Logan Avenue, Project #3611, Sewer District #13051,
in Kansas City, Jackson County, Missouri. The project will
serve 5 property owners, 7 parcels of land, and consist
of approximately 598 linear feet of 8 pipe.
Fire Station No.40 - Sanitary Sewer
Details | Show on Map
81000464Sanitary Sewers2Construct approximately 650 L.F. of new 8-inch sanitary
sewer, associated manholes and appurtenances to serve Fire
Station No. 40, Kansas City, Clay County, Missouri.
22nd-23rd Corridor Sec 1B - Tracy to Brooklyn
Details | Show on Map
89008008Streets3Geometric and roadway improvements along 22nd Street corridor
from Tracy to Brooklyn, consisting of drainage, grading,
paving, curbing, retaining walls, street lighting, traffic
signals and interconnection, pavement marking, signing,
landscaping, and other amenities.
N Bennington- Parvin Rd to NE 48th Street
Details | Show on Map
89008157Streets1Collector street upgrade from Parvin Rd to NE 48th Str.
Including additional lanes, water main relocation, and underground
utilities
New Police Academy
Details | Show on Map
89000930Buildings1This facility will house a 500 seat auditorium, administrative
offices for in-service training and recruiting, running
track, gym, weight room, fitness room, lockers, and showers.
It will also have various types and sizes of classrooms.
Located at 6885 NE Pleasant Valley Road.  The new Regional
135th & Cherry Sewer Connect. Construct
880' of sewer with appurtenances including
Details | Show on Map
81000384Sanitary Sewers6135th & Cherry Sewer Connect. Construct 880' of sewer
with appurtenances including PIAC 25% match
Music Hall Renovation
Details | Show on Map
89A00281Buildings2This project is considered a building rehabilitation and
addition.  Work on the Music Hall will consist of the
following 10 improvements:(1)  Stage expansion by adding
15 feet of depth.(2)  An upgraded steel penthouse
tower will be raised and expanded on the roof to accommodate
60th Street Sidewalks from Jackson to Cypress
Details | Show on Map
89060062Sidewalks5Design the reconstruction of curbs, drive approaches
and appurtenances and build sidewalks on both sides of 60th
Street from Jackson to Cypress. (This project is design
only.)
(E7009-CT) East Village Block 81 *Parking
Garage*
Details | Show on Map
640E7009Buildings2Construction of the East Village Block 81 Parking Garage
(Design-Build)
NE 32nd St. & N Garfield Ave.
Details | Show on Map
89003767Sanitary Sewers1Design and construct sanitary sewer extension to remove
residential properties off private septic systems. Water
main relocation to be funded separately.
NW Barry Road- section 1B2 N Conant to N
Congress
Details | Show on Map
89008124Streets2This project includes the widening of NW Barry Road to a
four lane divided median section with curbs and gutters,
an enclosed storm sewer, street lighting, bike lanes and
sidewalks.
PW3727 Sanitary Sewer extension in the
vicinity of 135th Street and Cherry Street
Details | Show on Map
81000250Sanitary Sewers6PW3727 Sanitary Sewer extension in the vicinity of 135th
Street and Cherry Street, Project #3727, Sewer District
#6028, in Kansas City, Jackson County, Missouri. The project
will serve 11 property owners and consist of approximately
880 linear feet of 8 pipe.
Municipal Aud. Ext. Renovation
Details | Show on Map
89B00281Buildings2This project involves cleaning and restoration of the masonry
and architectural elements on exterior of the building. 
3813 - 97th & Holmes Sanitary Sewer
Details | Show on Map
89003813Sanitary Sewers6Design and construction of sanitary sewers to serve approximately
10 properties currently on septic systems.
66th and Manchester
Details | Show on Map
89003451Sanitary Sewers5Design and construct sanitray sewer extension for 89 parcels
of land, with aproximately 240 residents. The properties
are served by private septic systems. This project will
allow the owners to tie into public sewers. Water Services
paying an additional $644,162 for construction not inlcuded
NE 50th Street and NE Barnes Ave.
Details | Show on Map
89003818Storm Sewers1Construct enclosed storm sewer along I-35 ROW, inlets, upgrade
two cross-road culverts, and other necessay appurtenances.
Part of 15SW PIAC bundle.
East Village 1% for Art
Details | Show on Map
640F7009Public Art2East Village 1% for Art
4814 N White
Details | Show on Map
82000094Storm Sewers1Storm Drainage Improvement at 4814 N White - Construct enclosed
system from front of 4814 N White; southwest to existing
curb inlet near 48th & Bellaire.
4206 E. 115th Street
Details | Show on Map
89003839Storm Sewers6Upgrade the existing storm sewer system from 114th Street
to the backyard of 4207 E 115th Street. Part of 15SW PIAC
bundle.
PW 3730 Sanitary Sewer extension in the vicinity
of NE 52nd Street and Randolph Road
Details | Show on Map
81000254Sanitary Sewers1PW 3730 Sanitary Sewer extension in the vicinity of NE 52nd
Street and Randolph Road, Project #3730, Sewer District
#20019. in Kansas City, Clay County, Missouri. The project
will serve 14 property owners, 15 parcels of land, and consist
of approximately 645 linear feet of 8 pipe.
NE 88th & N Lathrop Ave
Details | Show on Map
89003400Sanitary Sewers2This neighborhood will be upgraded by removing septic tanks
for fourteen homes though the construction of 2,192
lineal feet of sanitary sewers.
75th St. and Westridge Storm Drainage
Details | Show on Map
89003479Storm Sewers5Construct of tunnel under RR with approximately 700'
of storm sewer ranging in size from 18'' to 60'' in diameter,
including 200' of 72'' Permalok Steel Pipe trenchless construction,
a concrete headwall, 7 field inlets, 90 sq. yds. of pavement
restoration, 500 sq. yards of rip-rap.
59th & Norfleet Rd. SD 13045 &13046
Details | Show on Map
89003668Sanitary Sewers5Construction of 1,995 of 8' sanitary sewer to serve fourteen
properties in two sewer benefit districts to remove them
from septic tanks. Public Works funding $21,000 for street
rebuild.
Bannister Rd & Blue Ridge Blvd Geometric
and Signal Improvement
Details | Show on Map
89004283Traffic Signals6Geometric improvements and traffic signal modifications
at Bannister Road and Blue Ridge Blvd. Consisting of adding
left turn lanes and installation of mast arms, cameras,
pull boxes, traffic controller, conduits, and other necessary
appertunances.
5315 N. Washington Street
Details | Show on Map
89003823Storm Sewers2Construct an enclosed system from end of flum behind 5311
N Washington Street North and West to field inlet behind
5401 N Washington Court
7908 NW Milrey Dr./Stoddard Storm Sewer Sec
1 - NW Belvedere to NW 80th
Details | Show on Map
89003543Storm Sewers2Phase 1A: Construct approximately 1,950 feet of open channel
improvements consisting of gabion baskets, coir logs, sack
gabions and turf reinforcement matrix (TRM), replacement
and modification of existing storm drainage pipe outlets,
grading, plantings and seeding of native plant species,
Red Bridge Road, Phase 1
Details | Show on Map
890B8054Streets6Red Bridge Road, Phase 1Improve Red Bridge Road from Holmes
Road to Blue River Road. A 3 lane typical section will be
used for this section of Red Bridge Road. Other improvements
include adding curb, sidewalk, and a mutil use trail. 
Forrester Viaduct over Railroad
Details | Show on Map
89005438Bridges2Replacement of a 15 Span Rolled Steel Wide Flange Bridge.
This bridge extends over the Union Pacific Railroad, Santa
Fe, and Mulberry Streets. There will be access provided
on 9th Street, St. Louis Ave., Union Ave., Beardley Road,
and Union Ave. This b
72nd St. from College to Bales
Details | Show on Map
89003634Storm Sewers5Construct approximately 2,000' of storm sewer ranging in
size from 15'' to 48'' in diameter, 30 curb inlets, 1,500'
of curbing, pavement repair, replacement sidewalk and driveways,
two water main relocations, and sodding from 73rd &
Bales to 73rd & Indiana to 72nd & Indiana , and
N Brighton -M210 to Parvin Road
Details | Show on Map
89008112Streets1Geometric and roadway improvements in establishing a three
lane improvement on N. Brighton from Parvin to M210. Improvements
will consist of drainage, grading, paving, curbing, retaining
walls, street lighting, pavement marking, signing, landscaping
and other amenitities.
North Congress Street Improvements - 73rd
to Hwy. 9
Details | Show on Map
89008091Streets2This portion of N Congress serves as a collector road and
is a Phase III bike route. Row varies from 32 to 60'. The
bridge has been surveyed as needing maintenance. The creek
is a Zone A regulated floodplain that drains down to Parkville. 
PW 3613 Sanitary Sewer extension in the vicinity
of 48th Street and Emery Avenue
Details | Show on Map
81000249Sanitary Sewers5PW 3613 Sanitary Sewer extension in the vicinity of 48th
Street and Emery Avenue, Project #3613, Sewer District #13052,
in Kansas City, Jackson County, Missouri. The project will
serve 10 property owners, 11 parcels of land, and consist
of approximately 575 linear feet of 8 pipe.
Signal Synchronization Center
Details | Show on Map
890A0460Buildings1Development of a Traffic Signal Synchronization Center at
5600 Municipal Ave.
135th & Cherry St. Sewer Main Extension
Details | Show on Map
89003727Sanitary Sewers6Construction of 1,245 feet of 8' sanitary sewer with 285
feet bored under 135th st. west of the Missouri Pacific
railroad to serve 22 properties and remove four of them
off septic tanks north of 135th st and along Cherry Ave.
Water Services funding $240,000 for water main replacement.
NE 38th & N Brighton Sewers
Details | Show on Map
89003728Sanitary Sewers1Upgrading neighborhood on septic system to sanitary sewers
East Bannister Road Interceptor
Details | Show on Map
81000215Sanitary Sewers5Construction of approximately 5,150 linear feet of sanitary
sewer in order to switch the subdivisions
of Wedgewood Pointe, Unity Ridge/Gardens, and Silvertooth
Fahey Farms off of the Boggs Hollow sewer (Lee's Summit)
and onto the East Bannister Interceptor (Kansas City).  
NE 68th St. & N Belmont Ave .
Details | Show on Map
89003453Sanitary Sewers1Design and Construct 4100 feet sanitary sewer extension
to serve 30 properties that are currently on private septic
systems. SD 22086-87.
Broadway Streetscape 6th to 14th
Details | Show on Map
64007003Streetscape2Design & construction of streetscape improvements
along Broadway Boulevard between 10th & 12th Streets
and portions of the block between 8th & 9th Street. 
Streetscape elements include decorative brick pavers on
sidewalks, street trees, & pedestrian lights.
NW 64th-68th (Gower) Connector
Details | Show on Map
89001236Streets2Realign N. Gower to connect to NW64th Street with NW 68th
Street.
NE 61st St. & N Wheeling SD 20014-18
Details | Show on Map
89003406Sanitary Sewers16100 feet of sanitary sewer extension for 67 parcels of
land (63 property owners.) The properties are currently
on private septic systems.  SD 20014-18
93rd & Hillcrest
Details | Show on Map
89008131Streets6Construct exit for Fire Station 41.  Widen Hillcrest
Road to add turn lanes.  Improve traffic signals.
809 W 109th Terr. Drainage
Details | Show on Map
89003810Storm Sewers6Extend the existing system approx 100' downstream from rear
yard of 809 W 109th Terrace. Part of 15SW PIAC bundle.
3001 NE Russell Road
Details | Show on Map
82000093Storm Sewers1Demolish house at 3001 NE Russell Road;re-grade channel
to reduce area flooding.
Beacon Hill Infrastructure Phase IIIC-Drainage
Details | Show on Map
640C7021Streetscape3Design and construction of a water detention area at the
east side of Beacon Hill Lane commons.  Funded partially
by Federal grant.
Red Bridge over Blue River
Details | Show on Map
890B5464Bridges6Red Bridge over Blue River Construct a new bridge on
Red Bridge Road to span over Union Pacific Railroad and
the Blue River. Proposed new bridge will have two traffic
lanes, sidewalk, and a multi use trail.
Red Bridge Road, Phase 2
Details | Show on Map
890C8054Streets6Red Bridge Road, Phase 2Improve Red Bridge Road from Blue
River Road to Grandview Road.  A 3 lane typic section
is being proposed for this section of Red Bridge Road. 
Other improvements include adding curb, sidewalk and etc.
NE 44th Street and N. Brighton Ave.
Details | Show on Map
89003817Storm Sewers1Construction of approximately 650 l.f. of new storm sewer
from 4416 North Brighton to 4400 N. Brighton including the
replacement of the existing cross road pipes at 44th Street
and 44th Terrace, approximately 2 inlets and appurtenances
required to enclose
NE 96th St Bridge over East Fork Shoal Creek
Details | Show on Map
89005484Bridges1The existing bridge will be replaced with a prestress concrete
girder bridge. The new bridge will have shoulders and will
be constructed to comply with the future Shoal Creek Parkway
design that will have two, 12' traffic lanes and a bike-pedestrian
sidewalk.
Bartle Hall - N. Dock (5 Phases)
Details | Show on Map
890A0284Buildings2This project involves demolition and reconfiguration of
dock to improve functionality plus provide visual screening
of dock from adjacent properties, including perimeter
and overhead views.  There will also be a new
streetscape, using the Downtown Streetscape Master
Beacon Hill Infrastructure Phase IIIA
Details | Show on Map
64007021Streetscape3Conduit:Install conduit, ballards and KCP&L equipment
allowing power for future residents.IIIa2 stub alleys;
storm water extension and 26th Street Construction within
boundaries of 24th to 27th Street and Troost Avenue to
Paseo Blvd.   (possible 26th Street Watermain
3810 Ditzler Storm Drainage
Details | Show on Map
89003774Storm Sewers3Design and construct a stormwater drainage improvement to
alleviate runoff flooding the property and eroding the roadway
ditch. Water Services to pay additional $45,524 for water
main relocation.
18th & Vine Gateway Terrace
Details | Show on Map
890C0233Streetscape3This project provides construction of an outdoor terrace
for the 18th and Vine district.  The design was completed
in project 890D0233 - 18th & Vine Gateway Sign.
5921 N. Belton Drainage Issue
Details | Show on Map
89020076Storm Sewers1Improve storm drainage near 59th Ter. & N. Belton and
eliminate flooding at 5921 N. Belton.
(A7009-CT) East Village Block 100 *Bus Depot*
Details | Show on Map
640A7009Buildings2Complete the design, oversight, remediation and demolition
of the East Village Block 100 (Sports Castle and Greyhound
Building)
56th Street and Bellefontaine Ave.
Details | Show on Map
89003830Storm Sewers5Storm drainage improvements at this location consist of
the construction of approximately 510 l.f. of new storm
sewer along the back of 5614 and 5604 Bellefontaine Avenue
and the existing right-of-way of 56th Street to Town Fork
Creek, approximately 4 inl
N Oak Tfwy. (Sec. 2) 96th St. to 111th St.
Details | Show on Map
89008000Streets2Proposed improvements for Phase II, from NE 96th St. to
NE 111th St., will include widening the street to four lanes,
adding turn lanes at busy intersections, putting sidewalks
on both sides of the street, flattening out the road and
removing blind spots, adding curb cuts for wheel chairs,
Vehicle Processing Facility-VIF
Details | Show on Map
890A0502Buildings1The Project includes development and construction of an
approximately 5100 SF building for a Vehicle Processing
Facility for the City of Kansas City located at the
Vehicle Impound Facility.
NE Reinking Road Bridge over tributary of
Shoal Creek
Details | Show on Map
89005460Bridges1Replacement of  the existing bridge with a reinforced
concrete box culvert with a re-alignment of the existing
roadway to provide for creek stabilization.
Leeds Rd. & Hunter Ave. SD 10059
Details | Show on Map
89003372Sanitary Sewers3Design and construction of 2900 feet of gravity Sanitary
sewer extension. The sewer will serve 37 parcels of land
and benefit approximately 30 households. SD 10059.
StreetScape Improvements Town Pavillion
Details | Show on Map
64008053Streetscape2 Project consists of streetscape improvements around
the Town Pavilion building, specifically along Walnut Street
from 12th to Petticoat Lane, Petticoat Lane from Main to
Walnut and Main Street from Petticoat to 12th Street.
Red Bridge Road repair
Details | Show on Map
890A5464Bridges6This project is to repair the existing Red Bridge Road Bridge
over the Big Blue River. Scope includes repairing floor
beams, stringers, and etc.
FIRE STATION 35
Details | Show on Map
89000035Buildings5This facility is classified as a new facility. The station
will be designed to the Modified Battalion Headquarters
Space Allocation Standards. This project will construct
a fire station that will house 1 Battalion Chief, 3 Captains,
and 11 fire fighters. The facility will have an  appratus
8216 to 8218 Ruskin Way Drainage
Details | Show on Map
89003809Storm Sewers6Perform study for the design and construction of new
curb, two curb inlets, 130' of pipe and two drive approaches
at 8216 and 8218 Ruskin Way.
48th & Vermont
Details | Show on Map
89003829Storm Sewers5Construct curb and regrade intersection to drain properly.
Part of 15SW PIAC bundle.
(B7009-CT) East Village Block 82/49 *Bail
Bond Bld/Day Labor Bld*
Details | Show on Map
640B7009Buildings2Complete the design, oversight, remediation and demolition
of the East Village Block 82 (Bail Bond/Day Labor Building)
Corinthian Hall-Door & Window Renovation
& Replacement
Details | Show on Map
890B0190Buildings1In the Main Museum building and Carriage House:Project includes
removal of existing windows and doors and framing. New Historical-profile
windows & doors will be installed on the main floor,
basement and the upper two floors. The two existing bronze
doors will be cleaned and restored on site. Restoration
NW Interurban Rd. Bridge over Wildcat Branch
Details | Show on Map
89005445Bridges2The existing bridge will be replaced with a new bridge
that will have two 12 ft traffic lanes and a 5 ft sidewalk
on one side supported by single-span steel girders. A staged
construction method will be used to keep this bridge open
during construction.
Storm Swr Windsor Rd at 39th St
Details | Show on Map
82000117Storm Sewers3Improve drainage flow and eliminate erosion in roadside
ditch along the west side of Windsor Rd. north of 39th St.
St. John/ Benton Blvd. Entryway Phase 1
Details | Show on Map
89060081Streetscape1Design & construct an improvement to the intersection
of St. John Avenue & Benton Boulevard.  The
purpose of the project is to improve vehicular &
pedestrian safety & to create a gateway into the
St. John corridor & the Kansas City Museum.
31st St. Bridge over Wyandotte near Penn
Valley Park
Details | Show on Map
89005422Bridges4Replace the existing bridge with a three span prestress
girder bridge with curtain walls for the two side spans.
7601 NW 79th Place Drainage
Details | Show on Map
89003844Storm Sewers2Stop soil erosion and flooding of backyard.
Sni-A-Bar Bridge over KCSRR
Details | Show on Map
89005425Bridges5Replacement of single span open spandrel arch bridge with
a 3 span pre-stressed concrete girder bridge. This bridge
extends over KCSRR. There will be a realighment of approx.
245 LF of Eastwood Place and 1100 LF of Sni-A-Bar Road.
Additional ROW will have to be acquired.
Union Hill S/Scape - Storm Sewer
Details | Show on Map
64007019Storm Sewers40464The project includes Storm and Sanitary Sewer with associated
inlets, piping, manholes and fixtures in the Founders at
Union Hill Development.  Areas of work are 30th Street
near Gillham Road; another at 29th Street and McGee Street;
and another along McGee Street near Gillham Road. This is
NW 73rd St Bridge over small creek
Details | Show on Map
89005498Bridges2Replace the existing structural deficient bridge with a
concrete arch structure and reconstruct approach roadway
to improve sight distance.
104th Ter. and Walnut Drive
Details | Show on Map
89003840Storm Sewers6Reconstruct approximately 520' of lined open channel with
grade and erosion control along the back lot lines between
Walnut Drive and Grand Avenue (10420 Grand to 10501 Walnut
Drive. Part of 15SW PIAC bundle.
56th & Oak Neighborhood Entry Feature
Details | Show on Map
89020087Public Spaces5 Construct neighborhood wall and signage at 56th and
Oak.
New Metro Patrol 1% for Art
Details | Show on Map
890A0931Public Art51% for Art Project for the New Metro Patrol Station.
50th Terrace from 51st St. to Manchester
SDI
Details | Show on Map
89008147Storm Sewers5Reconstruct 200 feet of road, also construct curb, driveways,
on the south side of 50th Terrace from 51st Street to Machester
Trafficway.  This improvement is to solve a localized
flooding problem.
1604 E. 81st St Storm Improvements
Details | Show on Map
82000109Storm Sewers5Eliminate ponding near 1604 E. 81st St. and improve storm
water flow into existing ditch.
5133 N Wayne Storm Water Improvements
Details | Show on Map
82000099Storm Sewers1Evaluate stormwater drainage ditch and retaining wall behind
5133 N. Wayne and neighboring properties and provide
improvements to reduce erosion.
Hardy & 40 HWY Storm Improvements
Details | Show on Map
82000105Storm Sewers3Eliminate flooding problem at 3914 Hardy and reduce runoff
at intersection of 40th & Hardy.
2912 Blue Ridge Storm Improvements
Details | Show on Map
82000110Storm Sewers3Evaluate storm water flow from3016 Blue Ridge Blvd to 2908
Blue Ridge Blvd. and provide stormwater improvements
to reduce erosion and ponding and transport storm flows
to the low area west of Blue Ridge Blvd.
Emergency Sanitary Sewer Relocation @ 602
W. 88th Terrace, Council District #4The Installation
Details | Show on Map
81000343Sanitary SewersNAEmergency Sanitary Sewer Relocation @ 602 W. 88th Terrace,
Council District #4The Installation of 330 LF of new 8-inch
SDR 26 PVC sewer line in the area of 602 W. 88th Terr. in
Kansas City, MO.
Storm Drainage Improvement near 7204 NW 85th
Street
Details | Show on Map
82000103Storm Sewers2Improve drainage flow and reduce erosion of ditch behind
homes along NW 85th St. between 7404 NW 85th St. and 7306
NW 85th Ter.
Raytown Rd. Bridge over Round Grove Cr (W)
Details | Show on Map
89005448Bridges5Replacement of the existing bridge with a three span prestress
girder bridge with shoulders. The new bridge will be built
on the existing alignment.
3337-3341 E 105th Terr Storm Improvements
Details | Show on Map
82000111Storm Sewers6Improve storm drainage near 3341 E. 105th Ter. and eliminate
flooding problem.
41st St & Vineyard Storm Improvements
Details | Show on Map
82000106Storm Sewers3Eliminate ponding and improve storm water drainage at the
intersection of 41st St. & Vineyard Dr.
8621 NE 112th St Storm Improvements
Details | Show on Map
82000100Storm Sewers1Replace existing drop inlet near 8621 NE 112th St. &
fill and regrade area to promote positive drainage.
Storm Drainage Improvement near 3701 NW 61st
Street and Lenox
Details | Show on Map
82000102Storm Sewers2Improve cul-de-sac drainage on NW 61st. St. south of N.
Lenox.
1322 E. 84th Terr Storm Improvements
Details | Show on Map
82000108Storm Sewers5Improve storm water flow into inlets near 1322 E. 84th Terr.
17th St. Improvements Topping to Bennington
Avenue
Details | Show on Map
89060005Streets3East 17th Street from Topping (5800) to Bennington Avenues
Improving south side by providing curb, driveways, sidewalk,
widen pavement & appurt.
Blue Pkwy Bridge over Blue River
Details | Show on Map
89005465Bridges5Replace the exsiting bridge with a 1100 ft long steel plate
girder bridge with shoulders.
87th Street Section 1 - U71 to Denver
Details | Show on Map
89008037Streets6This project includes federal funding and is being completed
with MoDOT's review and oversight. The plans include the
removal of the existing 2-lane roadway with the replacement
to a 4-lane divided and undivided roadway on a straightened
alignment. The roadway improvements consist of the realigning,
400-600 Woodbridge Ln. Storm Improvements
Details | Show on Map
82000107Storm Sewers6Evaluate existing stormwater drainage channel, retaining
wall, pools and plantings behind and north of400 to
600 Woodbridge Lane and provide improvements to reduce
standing water, control silt deposition, and provide safety
decorative fence on walls. Project will include evaluation
8609 E. 77th Street Storm Improvements
Details | Show on Map
82000113Storm Sewers5Evaluate existing stormwater drainage and ditch/channel
running from the east side of8609 E. 77th Street north under
77th St. and continuing north, crossing Booth Ave. at 7609
Booth Ave. to a large existing ditch to the northwest. This
project is to perform a study of the area and make recommendations
Colorado Ave. Bridge (Lower Blue Parkway
Bridge over Blue River)
Details | Show on Map
89005537Bridges5Also known as the New Lower Blue Parkway Bridge.  This
bridge will be a steel plate girder bridge with concrete
pavement .  The bridge will replace the former lower
Blue Parkway Bridge and connect Bluebanks Avenue with the
relocated Manchester Trafficway and subsequenstly Blue Parkway.
Blue Ridge Blvd & 107th Street Geometric
and Signal Improvement
Details | Show on Map
89004421Traffic Signals6Upgrade existing controller and installation of new signal
equipment, and intersection geometrics to provide left turn
lanes on Blue Ridge Blvd.
18th & Vine Gateway Sign
Details | Show on Map
890D0233Streetscape3This project provides preliminary design services to determine
the basis of construction documents for landmark signs at
the east and west entrance to the 18th & Vine Jazz District.
The design will also include an outdoor terrace in the District
on partitioned project number 890C0233
801 NE Cookingham Dr.-Lakeside Drainage
Details | Show on Map
89003851Storm Sewers2Remove approximatley 500 l.f. existing storm sewer along
project alignment and improve approximatley 1,000 l.f. of
the storm sewer drainageway with storm sewer pipe or an
improved open channel.  Reconstruct existing roadway
and sidewalks at 2 roadway crossings. Construction estimate
Mission Lake Storm Improvements
Details | Show on Map
82000115Storm Sewers6Evaluate storm water lake at the southeast corner of Holmes
Road and Martha Truman Road that collects stormwater from
the drainage channel from the west under Holmes Road and
from the Lake to the east serving Mission Lake development
and discharges to a drainage channel to the east under Charlotte
Bob Mohart Phase III
Details | Show on Map
890B0404Buildings3 Robert J. Mohart Phase III Project will encompass
the Renovation of the South Parking Lot and Site Paving,
upgrades to the lighting and sound in the Auditorium and
Multipurpose Room and various interior patching and painting
to walls, replacement of lighting and ceiling tile in the
60th Terr. Sidewalks from 4246 E. 60th Terr.
to Elmwood (S side)
Details | Show on Map
89060064Sidewalks5 Design the reconstruction of curbs, drive approaches
and appurtenances and construct new sidewalk on the south
side of 60th Terrace from 4246 E. 60th terrace to Elmwood. 
48th & Emery
Details | Show on Map
89003613Sanitary Sewers5Sanitary sewer project for sewer district #13052.
County Detention Facility - 1300 Cherry
Details | Show on Map
57000150Buildings2Provide a location for Inmates currently housed in Kansas
City Municipal Corrections Institute. The City will design
and constuct space to house City inmates on the ground floor
of the County Detention Facility as well as the 3rd and
4th Floors of the Criminal Justice Building.
12th St. Viaduct over Railroad (Phase 3)
Details | Show on Map
89005442Bridges2Repair the bridge superstructure including bridge deck,
expansion devices, and railings.
FIRE STATION 39
Details | Show on Map
230A0039Buildings5New (two bay) fire station replacement of existing No.
39 at 10003 E. 47th St. New Station will be built at 47th
& Sterling.The structure will be a one story
building which will include a day room and kitchen area,
sleeping quarters and office for captains and fire staff,
DEMO 83rd Street Bridge
Details | Show on Map
890A5474Bridges5Demolition of 83rd Street Bridge over Kansas City Southern
Railroad tracks. 
49th & Farley Ave. Sanitary Sewer
Details | Show on Map
89003778Sanitary Sewers5This project will construct new gravity sewer infrastructure
including 8" pipe to serve 41 parcels and 35 houses. This
project will remove residences from septic systems.
75th and Cleveland
Details | Show on Map
89003831Storm Sewers5Construction of new curbs along both sides of 75th Terrace
for a distance of approximately 100 feet, approximately
30 l.f. of storm sewer, approximately 3 inlets, and pavement
improvements. Part of 15SW PIAC bundle.
87th St - Section 2 - 1.2 Miles E of BRW
Details | Show on Map
89008113Streets6Roadway improvements consist of the realigning, widening,
paving, replacing curbs and gutters, sidewalks, storm and
sanitary sewers, water main relocation, and other appurtenances
along with the addition of roundabouts at both I-435
intersections, Hillcrest Road and Newton Avenue for this
18th & Vine Building 1511 - 1513 E 18th
Details | Show on Map
640A6344Buildings3Development of the 18th & Vine Buildings at 1511 - 1513
East 18th Street
23rd St. Bridge Near Kemper Arena
Details | Show on Map
89005406Bridges2Major repairs to the 23rd street viaduct and removal of 
Wyoming Street Viaduct.
Criminal Justice Building Abatement - 1035
Locust
Details | Show on Map
570A0150Buildings2Provide a location for Inmates currently housed in Kansas
City Municipal Corrections Institute. The City will design
and constuct space to house City inmates on the ground floor
of the County Detention Facility as well as the 3rd and
4th Floors of the Criminal Justice Building.
56th Ter and Booth Ave.
Details | Show on Map
89003835Storm Sewers5Construct approximately 1200' of pipe to enclose storm sewer
system from rear yard of 5624 Booth to Rinker Road. Part
of 15SW PIAC bundle. Estimate inlcude only first [hase of
project.
88th & N Forest Ave.
Details | Show on Map
89003409Sanitary Sewers2This area will remove septic tanks for nineteen
homes with the construction of 2,350 feet of sanitary
sewer. Water Services paying additional $100,657 toward
construction that is not reflected in the budget.
Raytown Rd. Bridge over Round Grove Cr (E)
Details | Show on Map
89005447Bridges5The new bridge will have a total of three spans and will
be constructed on the existing alignment.
NE 39th St. & Prather Rd. Sewer Ext
Details | Show on Map
89003566Sanitary Sewers1Design and construct sanitary sewer extension to remove
residential properties from private septic systems and connect
them to public sewers.
Northwestern Avenue and 21st Street Reconstruction
Details | Show on Map
89008045Streets4Reconstruction of Northwestern Avenue and 21st Street roadways
American Jazz Museum Improvements
Details | Show on Map
07000235Buildings3Complete the reconfiguration of the Jazz Museum Education
Center to hold the new John Baker film exhibit
Vehicle Impound Facility
Details | Show on Map
89000502Buildings1 This new facility, designed to provide services for
a new Tow Lot Facility to support the Neighborhood &
Community Services Department, Tow Lot Services Department,
will replace the existing operations at 6817 Stadium Drive
in Kansas City.  The program for this replacement facility calls
Westport Pedestrian Streetlighting
Details | Show on Map
89007516Streets4The project consists of putting pedestrian lights along
Roanoke and other sites in Westport.  Funding is through
PIAC.
Highway 40 & Marsh Sanitary Sewer
Details | Show on Map
89003646Sanitary Sewers3Updating neighborhood on septic system to sanitary sewers.
This project requires the completion of a Water Services
Department extension sewer prior to construction.
KC Business Assistance Center
Details | Show on Map
070C0178Buildings2Provide a Business Assistance Center for Kansas City Missouri.
This center will be located in the Parking Garage in storefront
at 1118 Oak Street.  Scope includes renovating the
space to accomodate this function.
Town Fork Creek Boundary Signage
Details | Show on Map
89020074Public Spaces547th Streeet - 63rd street from Prospect to Cleveland; neighborhood
signage at four corners; minimal landscaping.
NW Barry Rd (West of I-29) Sec 2 - N Conant
to Amity
Details | Show on Map
89008078Streets2This project includes the widening of NW Barry Road from
N. Potomac to N. Conant Avenue and includes the widening
of N Amity Ave. from NW Barry Road to M-152 including the Barry
Road over Rush Creek (Project 89005408) and N. Amity
Culverts (Project 89005487). A four lane undivided-median
Beacon Hill Green Demonstration Project
Details | Show on Map
640B7315Streetscape3This project consists of design and construction of a green
demonstration project, featuring landscaping that is attractive
as well as provides storm water absorption and erosion control. 
Estimated time for project completion is summer 2010.
Beacon Hill NW Quadrant
Details | Show on Map
640A7315Streetscape3The scope of the NWQuadrant project is design and construction of
stub alleys, streets, water infrastructure, storm and sanitary
sewers and streetlighting between Troost and Tracy, and
Bruce R. Watkins Drive and Beacon Hill Lane. 
Locust & Cherry Island Improvements
Details | Show on Map
89020187Streetscape4